My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EOC change order 2
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
EOC change order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:26:45 PM
Creation date
5/28/2026 12:26:22 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #2 for the New Search & Rescue/EOC Facility
Order
14
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUBER BROTHERS, LLC <br />411 Keys Road • YAKIMA, WA. 98901 • FAX: (509) 452-6265 • Telephone (509) 457-1555 • tom@huberbros.com <br /> <br />Proposal to Supply Material & Labor <br />Date 5/14/2026 <br />Submitted to Belsaas & Smith Construction, Inc. <br />Attention Scott Carlson <br />Project Kittitas County Search & Rescue/EOC Facility <br /> Cle Elum, WA <br />We hereby submit specifications and estimates for providing all supervision, labor, supplies, and <br />equipment for furnishing and Installing the reinforcing steel on the above referenced project. <br /> <br />Addendums: NONE <br />Prevailing Wages: Kittitas County – excludes apprenticeship hours <br /> <br />Rebar: <br /> Building Shell <br /> -Furnish Only $18,775.00 <br /> -Installation $14,530.00 <br />Dowels: <br /> 1/2" dia. x 24” Gr. A36 Smooth & Ungreased <br /> -Furnish Only $1.95 each <br /> <br />Delivery (approx. one trip) $500.00 per trip <br /> <br />All material delivered more than sixty days after bid date will be subject to possible <br />price increases. <br /> <br />Excludes: No retainage on material ordered and delivered. No more than 5% <br />retainage on labor amounts owed. <br /> <br />*** This proposal may be withdrawn by us if not accepted <br />within 15 days *** <br /> <br />We require a minimum of 2 weeks lead time for first submittals after receipt of CAD <br />files or drawings for our use. 3 weeks lead time to fabricate and deliver bar plus review <br />time by architect/engineer, <br /> <br />Huber Brothers, LLC – Terms and Conditions for Material Sale <br /> <br />1. General Contractor to provide hoisting and operator to unload material. <br />2. Unless otherwise noted, prices quoted for FOB truck jobsite are nearest point <br />accessible to 48’ trailers, full truck load quantities. <br />3. Any reference to approximate quantities or approximate weights is for <br />convenience only. <br />4. In the event the Customer accepts only a portion of the Bid items quoted, <br />Huber Brothers, LLC reserves the right to reject the Quote in its entirety,
The URL can be used to link to this page
Your browser does not support the video tag.