Laserfiche WebLink
GENERAL <br />1. RULES, REGULATIONS, STANDARDS, AND CODES REFERENCED IN THESE NOTES ARE THE VERSION MOST RECENTLY <br />ADOPTED BY PERMITTING AUTHORITY. <br />2. VERIFY ALL DIMENSIONS AND CONDITIONS WITH ARCHITECTURAL DRAWINGS. <br />3. FOR FEATURES OF CONSTRUCTION NOT FULLY SHOWN, PROVIDE THE SAME TYPE AND CHARACTER AS SHOWN FOR <br />SIMOLAR CONDITIONS, SUBJECT TO REVIEW BY THE STRUCTURAL ENGINEER OF RECORD. <br />4. DO NOT SCALE THE DRAWINGS. <br />5. APPLY, PLACE, ERECT OR INSTALL ALL PRODUCTS AND MATERIALS AN ACCORDANCE WITH THE MANUFACTURER'S <br />INSTRUCTIONS. <br />6. PROVIDE MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES INCLUDE, <br />BUT MAY NOT BE LIMITED TO, BRACING AND SHORING FOR LOADS DURING CONSTRUCTION. ADEQUATELY BRACE <br />STRUCTURE AND ALL STRUCTURAL COMPONENTS AGAINST LATERAL FORCES (SUCH AS WIND, SEISMIC, AND EARTH <br />FORCES), UNTIL THE PERMANENT LATERAL FORCE-RESISTING SYSTEMS HAVE BEEN INSTALLED. VISITS TO THE SITE <br />BY THE OWNER'S REPRESENTATIVE WILL NOT INCLUDE OBSERVATION OF THE ABOVE NOTED ITEMS. <br />7. LESLIE ENGINEERING, LLC. HAS NOT BEEN RETAINED TO PROVIDE ANY SEVICES RELATED TO JOB SITE SAFETY <br />PRECAUTIONS, OR TO REVIEW THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR THE <br />CONTRACTOR. <br />DESIGN CRITERIA <br />1. BUILDING CODE <br />2018 INTERNATIONAL BUILDING CODE (IBC) WITH STATE OF WASHINGTON AMENDMENTS <br />RISK CATEGORY = IV (ESSENTIAL FACILITIES) <br />2. DESIGN LOADS <br />DEAD <br />ROOF DEAD LOAD = BUILDING SELF-WEIGHT <br />COLLATERAL LOAD: 4 PSF SOLAR SURCHARGE ALLOWANCE <br />+ 6 PSF CEILING, LIGHTING, MECH, MISC <br />TOTAL COLLATERAL LOAD = 10 PSF <br />LIVE <br />ROOF LIVE LOAD = 20 PSF (DOES NOT GOVERN) <br />SNOW <br />ROOF SNOW LOAD = 140 PSF (FROM KITTITAS COUNTY) <br />WIND <br />BASIC WIND SPEED = 110 MPH <br />EXPOSURE CATEGORY = C <br />COMPONENTS AND CLADDING <br />WIND UPLIFT <br />EFFECTIVE WIND AREA <br />100 sq.ft. 10 sq.ft. <br /> ZONE 1 -31.5 psf -36.7 psf <br /> ZONE 2 -33.8 psf -43.0 psf <br /> ZONE 3 -53.0 psf -74.7 psf <br />ALL LOADS ARE STATED IN <br />STRENGTH-LEVEL FORCES (LRFD) <br />SEISMIC <br />SS = 0.61g <br />S1 = 0.23g <br />SDS = 0.53g <br />SD1 = 0.33g <br />Ie = 1.5 <br />SDC = D <br />FOUNDATIONS ARE DESIGN BASED ON PRELIMINARY PEMB INFORMATION, AND MUST BE VERIFIED AGAINST <br />FINAL METAL BUILDING CALCULATIONS/REACTIONS PRIOR TO BEGINNING EXCAVATION WORK. <br />MAXIMUM FRAME DEFLECTION = h/120 (UNDER SERVICE LEVEL WIND OR SEISMIC LOADS) <br />3. SOIL CRITERIA: <br />ALLOWABLE SOIL BEARING PRESSURE = 5000 PSF (DEAD AND LIVE LOADS) <br /> = 6667 PSF (SHORT TERM LOADS) <br />FOUNDATIONS <br />1. A GEOTECHNICAL INVESTIGATION HAS BEEN CONDUCTED FOR THIS PROJECT. THE DESIGN OF THE FOUNDATION <br />SYSTEM IS BASED UPON THE RECOMMENDATIONS IN THIS REPORT. <br />REPORT TITLE: PREPARED BY: <br />GEOTECHNICAL ENGINEERING REPORT ERIC SCHELLENGER, PE <br />KITTITAS COUNTY SEARCH AND RESCUE FACILITY GEOTECHNICAL ENGINEER <br />CLE ELUM AIRPORT ROAD ASPECT CONSULTING, LLC <br />CLE ELUM, WA 23 S MISSION ST, SUITE C <br />Project No. 220471 WENATCHEE, WA 98801 <br />Date: September 27, 2023 509-888-5766 <br />2. REFER TO THE GEOTECHNICAL REPORT FOR ALL SITE PREPARATION REQUIREMENTS AND FOOTING/SLAB SUBGRADE <br />PREPARATION REQUIREMENTS. <br />CONCRETE REINFORCING STEEL <br />1. REINFORCING STEEL SHALL BE ASTM A615, GRADE 60, TYPICAL, UNLESS NOTED OTHERWISE. <br />2. DETAIL, FABRICATE AND PLACE REINFORCING ACCORDING TO ACI 315, "DETAILS AND DETAILING OF CONCRETE <br />REINFORCMENT." <br />3. ACCURATELY POSITION, SUPPORT AND SECURE REINFORCEMENT FROM DISPLACING DUE TO FORMWORK, <br />CONSTRUCTION, OR CONCRETE PLACEMENT OPERATIONS. LOCATE AND SUPPORT REINFORCING BY METAL CHAIRS, <br />RUNNERS, BOLSTERS, SPACERS, AND HANGERS AT A MAXIMUM SPACING OF 3'-0" ON CENTER. <br />4. DO NOT FIELD BEND, DISPLACE, WELD, HEAT OR CUT REINFORCING UNLESS INDICATED ON THE DRAWINGS, OR <br />APPROVED BY STRUCTURAL ENGINEER OF RECORD. <br />5. MINIMUM COVER FROM CONCRETE SURFACES TO REINFORCING SHALL BE AS FOLLOWS: <br />3" ± 1/2" TO BOTTOM OF FTG <br />1 1/2" ± 1/4" TO TOP OF SLAB-ON-GRADE. <br />6. REINFORCING LAP SPLICES (INCHES): CONFORM WITH ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED <br />CONCRETE", AS SHOWN BELOW, UNLESS NOTED OTHERWISE ON DRAWINGS: <br /> BAR f'C <br /> SIZE 3000 PSI 4000 PSI <br /> #3 22" 19" <br /> #4 29" 25" <br /> #5 36" 31" <br /> #6 43" 37" <br />LAP SPLICE NOTE: <br />A. SPLICE LENGTH BASIS: CLASS B, SPLICE, WITH CENTER-TO-CENTER BAR SPACING GREATER THAN 3 BAR <br /> DIAMETERS, AND CONCRETE COVER AT LEAST 1 BAR DIAMETER. <br />B. SPLICES SHALL BE STAGGERED AT LEAST 24". <br />CAST-IN-PLACE CONCRETE <br />1. PROVIDE CONCRETE MATERIALS, FORM WORK, MIXING, PLACING, AND CURING ACCORDING TO ACI 301, "STANDARD <br />SPECIFICATION FOR STRUCTURAL CONCRETE." <br />2. CONCRETE MIX DESIGNS: <br /> MIN f'C W/C AIR TARGET COARSE FLY ASH <br />LOCATION (28 DAYS) (MAX) (%) SLUMP AGG SIZE CONTENT <br />NEW FOUNDATIONS 3000 psi 0.52 6 4" 3/4" 0%-25% <br />INT. SLABS ON GRADE 4000 psi 0.48 0 4" 3/4" 0%-25% <br />3. TARGET SLUMP, ±1", ASSUMES ADMIXTURES INCLUDED, AS REQUIRED. <br />4. FLY ASH SHALL CONFORM TO ASTM C618, TYPE F. FLY ASH SHALL REPLACE CEMENT BY WEIGHT BASED ON THE <br />ACCEPTABLE PERCENTAGE RANGE LISTED IN THE TABEL ABOVE. <br />5. CONCRETE MIX PROPORTIONS SHALL CONFORM TO ACI 318, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL <br />CONCRETE" AND TARGET SLUMP AS NOTED AN THE TBLE ABOVE. <br />6. SUBMIT MIX DESIGNS, WITH COMPLETE STATISTICAL BACKUP, FOR REVIEW AND APPROVAL, PROIR TO PLACEMENT. <br />7. ALL CONSTRUCTION JOINTS SHALL HAVE A ROUGHENED CONTACT AREA OF A FULL AMPLITUDE OF APPROXIMATELY <br />1/4", LEAVING THE CONTACT SURFACE CLEAN AND FREE OF LAITANCE. <br />8. CHAMFER EXPOSED CORNERS 3/4", UNLESS NOTED OTHERWISE. <br />CONCRETE SLABS ON GRADE <br />1. THE GENERAL CONTRACTOR SHALL CONTROL & MONITOR CONSTRUCTION PROCEDURES AND CONDITIONS AS <br />REQUIRED TO PROVIDE A HIGH QUALITY FINISHED SLAB WITH MINIMAL CRACKS, CURLING, AND SURFACE DEFECTS. <br />PROCEDURES AND CONDITIONS UNDER THE CONTROL OF THE GENERAL CONTRACTOR INCLUDE, BUT ARE NOT <br />LIMITED TO: PROVISIONS FOR AMBIENT WEATHER CONDITIONS, CURING METHODS SELECTED, RATE OF PLACEMENT, <br />JOINT ARRANGEMENT AND INSTALLATION, TEMPERATURE CONTROL, SUBGRADE PREPARATION, AND REINFORCING <br />PLACEMENT. <br />2. SLAB JOINTS: JOINTLOCATIONS HAVE BEEN PROVIDED ON THE FOUNDATION PLAN. PROPOSED REVISIONS TO SLAB <br />JOINT LAYOUT MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL. IN GENERAL, ADHERE TO THE FOLLOWING <br />CRITERIA: <br />A.MAXIMUM JOINT SPACING 20'-0" <br />B.MAXIMUM ASPECT RATIO BETWEEN JOINTS:1.5:1 <br />C.AVOID RE-ENTRANT CORNERS. IF RE-ENTRANT CORNERS CANNOT BE AVOIDED, PROVIDE (2) #4 <br />DIAGONAL BARS AT RE-ENTRANT CORNERS. <br />ANCHORS IN CONCRETE <br />1. INSTALL ANCHORS TO MANUFACTURER'S RECOMMENDATIONS. <br />2. INSTALL ANCHORS WITH IBC SPECIAL INSPECTION ACCORDING TO SPECIAL INSPECTION PROGRAM. <br />3. ANCHOR SYSTEMS MUST BE ICC-ES APPROVED. <br />4. EXPANSION ANCHOR MATERIAL SHALL BE HOT-DIP GALVANIZED ACCORDING TO ASTM A153, OR BE AISI 304 STAINLESS <br />STEEL. <br />5. ACCEPTABLE EXPANSION ANCHORS: <br />HILTI KWIK BOLT TZ <br />6.EPOXY ANCHOR SYSTEM SHALL CONSIST OF ALL-THREAD ROD, NUT, WASHER AND ADHESIVE INJECTION GEL SYSTEM. <br />7.ANCHOR RODS SHALL HAVE ROLLED THREADS. <br />8.ANCHOR ROD NUTS SHALL CONFORM WITH ASTM A194. <br />9.ROD MATERIAL SHALL MEET ONE OF THE FOLLOWING REQUIREMENTS: <br />A.ASTM F1554, GRADE 36, GRADE 55, OR GRADE 105 MATERIAL, HOT DIP GALVANIZED ACCORDING TO <br />ASTM A153. <br />B.ASTM A193, GRADE B7 MATERIAL, HOT DIP GALVANIZED ACCORDING TO ASTM A153. <br />C.AISI 304 OR AISI 316 STAINLESS STEEL, CONFORMING TO ASTM F593. <br />10.ACCEPTABLE ADHESIVE INJECTION GEL SYSTEM: <br />HILTI HY-200. <br />SPECIAL INSPECTIONS <br />INSPECTION ITEM (P)(C)NOTES <br />SOIL <br />VERIFY SOIL BEARING CAPACITY BELOW SHALLOW FOUNDATIONS X NA <br />VERIFY FOUNDATION EXCAVATIONS HAVE REACHED SPECIFIED DEPTH X NA <br />CONCRETE <br />REINFORCING STEEL X <br />LOCATION AND SIZE OF CAST-IN-PLACE ANCHORS X <br />MECHANICAL EXPANSION ANCHORS X <br />EPOXY ADHESIVE INSTALLATION X <br />ABBREVIATIONS <br />@ AT <br />Ø DIAMETER <br />AB ANCHOR BOLT <br />ABV ABOVE <br />ADD'L ADDITIONAL <br />ACI AMERICAN CONCRETE INSTITUTE <br />AGG AGGREGATE <br />AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION <br />AISI AMERICAN IRON AND STEEL INSTITUTE <br />ALT ALTERNATE <br />ASTM AMERICAN STANDARD TEST INSTITUTE <br />AWS AMERICAN WELDERS SOCIETY <br />BLKG BLOCKING <br />BM BEAM <br />BOT BOTTOM <br />BTWN BETWEEN <br />(C)CONTINUOUS <br />CJP COMPLETE JOINT PENETRATION <br />CLR CLEAR <br />CMU CONCRETE MASONRY UNIT <br />COL COLUMN <br />CONC CONCRETE <br />CONT CONTINUOUS <br />CY CUBIC YARD <br />DIA DIAMETER <br />DIAG DIAGONAL <br />DIM DIMENSION <br />DIR DIRECTION <br />(E)EXISTING <br />EA EACH <br />EF EACH FACE <br />EL ELEVATION <br />EMBED EMBEDMENT <br />EOR ENGINEER OF RECORD <br />ESR EVALUATION SERVICE REPORT <br />EW EACH WAY <br />f'C CONCRETE COMPRESSIVE STRENGTH <br />FDN FOUNDATION <br />FRMG FRAMING <br />FTG FOOTING <br />GALV GALVANIZED <br />HDG HOT-DIP GALVANIZED <br />HORIZ HORIZONTAL <br />HSS HOLLOW STRUCTURAL SECTION <br />IBC INTERNATIONAL BUILDING CODE <br />ICC INTERNATIONAL CODE COUNCIL <br />ICC-ES INTERNATIONAL CODE COUNCIL EVALUATION SERVICE <br />LB(S)POUNDS <br />LLH LONG LEG HORIZONTAL <br />LLV LONG LEG VERTICAL <br />MAX MAXIMUM <br />MB MACHINE BOLT <br />MIN MINIMUM <br />(N)NEW <br />NA NOT APPLICABLE <br />NO.NUMBER <br />NTS NOT TO SCALE <br />O.C.ON CENTER <br />(P)PERIODIC <br />P.E.S.PANEL EDGE SCREWS <br />PL PLATE <br />PLCS PLACES <br />PLF POUNDS PER LINEAR FOOT <br />PP PARTIAL PENETRATION <br />PSF POUNDS PER SQUARE FOOT <br />PSI POUNDS PER SQUARE INCH <br />R RADIUS <br />REINF REINFORCING <br />REBAR REINFORCING BAR <br />REQ'D REQUIRED <br />SCHED SCHEDULE <br />SF SQUARE FEET <br />SHTG SHEATHING <br />SIM SIMILAR <br />SIP STRUCTURAL INSULATED PANEL <br />SS STAINLESS STEEL <br />STD STANDARD <br />STIFF STIFFENER <br />T&B TOP AND BOTTOM <br />THRD THREADED <br />T.O.TOP OF <br />TYP TYPICAL <br />UNO UNLESS NOTED OTHERWISE <br />VERT VERTICAL <br />VIF VERIFY IN FIELD <br />W/WITH <br />WABO WASHINGTON ASSOCIATION OF BUILDING OFFICALS <br />W/C WATER TO CEMENT RATIO <br />WF WIDE FLANGE <br />WP WORK POINT <br />Civil & Structural Engineering <br />LESLIE ENGINEERING PROJECT NO: 2023-127 <br />48012 <br />D A N IEL J .S UMERFI <br />E <br />L <br />D <br />ST A TE <br />O F W A SHIN <br />G <br />T <br />O <br />N <br />REENIGNEOISSEF <br />O <br />R <br />P <br />LAN <br />REENIGNEUTCUR <br />T <br />S <br />LAR <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />J <br />K <br />L <br />M <br />1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 236 <br />1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 206 <br />REVISION <br />SHEET NO. <br />DRAWN BY <br />PROJECT NO. <br />DATE <br />© Copyright reserved. All parts of this <br />drawing are the exclusive property of <br />BORArchitecture, pllc and shall not be <br />used or reproduced in any way without <br />the expressed written permission of <br />BORArchitecture, pllc. <br />BO <br />R <br />A <br />BO <br />R <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />BO <br />R <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />, <br /> <br />p <br />l <br />l <br />c <br />Ya <br />k <br />i <br />m <br />a <br />, <br /> <br />W <br />a <br />s <br />h <br />i <br />n <br />g <br />t <br />o <br />n <br /> <br /> <br />9 <br />8 <br />9 <br />0 <br />2 <br />ww <br />w <br />. <br />b <br />o <br />r <br />a <br />r <br />c <br />h <br />. <br />c <br />o <br />m <br />13 <br />2 <br />0 <br /> <br />N <br />. <br /> <br />1 <br />6 <br />t <br />h <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />C <br />(5 <br />0 <br />9 <br />) <br /> <br />4 <br />5 <br />4 <br />- <br />3 <br />2 <br />9 <br />9 <br /> <br /> <br /> <br /> <br />21 22 <br />SHEET NAME <br />5/ <br />1 <br />3 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />9 <br />: <br />1 <br />8 <br />: <br />1 <br />5 <br /> <br />A <br />M <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />D <br />a <br />n <br />i <br />e <br />l <br />\ <br />D <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />2 <br />0 <br />2 <br />3 <br />- <br />1 <br />2 <br />7 <br /> <br />- <br /> <br />K <br />C <br />S <br />R <br /> <br />E <br />m <br />e <br />r <br />g <br />e <br />n <br />c <br />y <br /> O <br />p <br />e <br />r <br />a <br />t <br />i <br />o <br />n <br />s <br /> <br />C <br />e <br />n <br />t <br />e <br />r <br /> <br />- <br /> <br />C <br />E <br />N <br />T <br />R <br />A <br />L <br /> <br />- <br /> <br />R <br />2 <br />4 <br />_ <br />d <br />a <br />n <br />i <br />e <br />l <br />@ <br />l <br />e <br />s <br />l <br />i <br />e <br />e <br />n <br />g <br />in <br />e <br />e <br />r <br />i <br />n <br />g <br />. <br />c <br />o <br />m <br />. <br />r <br />v <br />t <br />5/13/2026 9:18:15 AM <br />5/8/20262 <br />S001 <br />2023-127 <br />03/12/2024 <br />HGH <br />GENERAL <br />STRUCTURAL <br />NOTES <br />NE <br />W <br /> <br />S <br />E <br />A <br />R <br />C <br />H <br /> <br />& <br /> <br />R <br />E <br />S <br />C <br />U <br />E <br />/ <br />E <br />O <br />C <br /> <br />F <br />A <br />C <br />I <br />L <br />I <br />T <br />Y <br />PE <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br />GE <br />N <br />E <br />R <br />A <br />L <br /> <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />KI <br />T <br />T <br />I <br />T <br />A <br />S <br /> <br />S <br />E <br />A <br />R <br />C <br />H <br /> <br />& <br /> <br />R <br />E <br />S <br />C <br />U <br />E <br />FOUNDATION SIZES HAVE BEEN REVISED <br />FOR PEMB SUBMITTAL FROM PACIFIC <br />BUILDING SYSTEMS DATED 4/24/26 <br />2