Laserfiche WebLink
5/19/2026 <br /> EAST WENATCHEE GOVERNMENT RESIDENTS BUSINE&' <br /> B. Preapproved wAsrc1NGiQ <br /> Plans <br /> Credit: East Wenatchee <br /> t <br /> Dabinet Floor Plan <br /> _ LU <br /> .s. <br /> Jonagold Floor Plan <br /> Attached ADU Detacned'ADU InteriorADl1 <br /> It . --�: t <br /> fi009P.�awelii•tl aolt <br /> InterforADU <br /> ity of <br /> 5 <br /> 5 <br /> B. Preapproved Alpine-1 bed,I both 455 SF Maple-2 bed,I both 665SF <br /> Plans <br /> Credit:Cit of Leavenworth;Another example: <br /> i v o Lacey <br /> Pros: <br /> • Could significantly speed review timelines <br /> • Reduces uncertainty for homeowner 9m; <br /> Cons: " <br /> At 455 SF,ALPINE provides an efficient living <br /> • Procurement process/timeline to establish, spacewith a single bedroom and full both. <br /> unknown designer interest <br /> • Unknown demand/limited uptake Thisdesign includesan open kitchen,dining, <br /> Liability considerations and Wing space and a covered entry porch. At 065 SF,MAPLE is.two-bedroom cottage <br /> • <br /> consisting of a central entry porch with an <br /> • Funding limitations open functional living space on one side and <br /> • Customization limitations sleeping spaces on the other,separated by <br /> the utility core.This design features both a <br /> • Maintaining fans when building code large.ndsmall bedroom,each containing. <br /> changes(no Ix expense) full-size closet.It provides full amenities and <br /> 4 Not prioritized due to time/cost relative to storage in a condensed,efficient footprint <br /> expected benefit <br /> City of <br /> s <br /> 6 <br /> 3 <br />