My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-088
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
R2026-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 12:25:16 PM
Creation date
5/27/2026 12:24:02 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE: ANNEX RESTROOMS <br />This optlon represents the cost to add two singNe occupancy <br />resti-ooms to t[']e Annex side of the building. <br />Thrs uuork nequires the Wanrn Shell and Annex Slab scopes to be <br />con'lpNeted. <br />1. CONSTRUCTION COSTS $137,345 <br />lnterior Framing <br />lnterior Finishing <br />Plumbing Fixtures <br />Toilet Accessories <br />MEPF (mechanical, electrical, plumbing, fire protection) <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$70,754 <br />TOTA!- CSST $208"'t00 <br />scoPrNG I nz <br />Two single occupancy restrooms. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical:This option includes all branch level ductwork, <br />single duct terminal units, GRDs, building controls, and heating <br />water piping to support the bucket's build-out areas. <br />Plumbing: All Level 0 above grade plumbing to service the <br />areas outlined in this scope are previously completed. All <br />water, waste, and vent piping, fixtures, valves, and balancing <br />of hot water recirculation system is included to support this <br />scope's build-out areas. <br />Fire Sprinkler: All sprinkler piping and heads required to <br />service this bucket's build-out areas <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the planned restrooms. <br />Permanent lighting will be installed in finished areas. <br />Mechanical connections will be provided to support planned <br />mechanical improvements. Power circuits will be served from <br />the existing branch panels located in the main electrical room. <br />Fire alarm devices will be served from the existing FACP. <br />Architectural: <br />Electrical
The URL can be used to link to this page
Your browser does not support the video tag.