My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-088
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
R2026-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 12:25:16 PM
Creation date
5/27/2026 12:24:02 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This option represents the cost to cornplete the landscape, <br />hardscape, and concrete patio at the north side of the building. <br />It is required to bring the north exit of the Heat Plant up to code. <br />Providihg a secondahT accessible means of egress. <br />This cost ls based on the previous design however a more nrodest <br />design could achieve the tode requirerients for egress and be a <br />cost savings. <br />SCOPE: SITE NORTH <br />1. CONSTRUCTTON COSTS $349,015 <br />Excavation <br />Concrete Patio & Ramp <br />Concrete Paving <br />Landscaping <br />lrrigation <br />Electrical <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$179,796 <br />TOTAL COST $528,811 <br />scoPtNG I oz <br />Architectural: <br />Landscape, hardscape, and concrete patio at the north side of <br />the building <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />New power and lighting will be provided for accent lighting at <br />site walkways. Power circuits will be served from the existing <br />branch panels located in the main electrical room <br />Electrical:
The URL can be used to link to this page
Your browser does not support the video tag.