Laserfiche WebLink
This option represents the cost to cornplete the landscape, <br />hardscape, and concrete patio at the north side of the building. <br />It is required to bring the north exit of the Heat Plant up to code. <br />Providihg a secondahT accessible means of egress. <br />This cost ls based on the previous design however a more nrodest <br />design could achieve the tode requirerients for egress and be a <br />cost savings. <br />SCOPE: SITE NORTH <br />1. CONSTRUCTTON COSTS $349,015 <br />Excavation <br />Concrete Patio & Ramp <br />Concrete Paving <br />Landscaping <br />lrrigation <br />Electrical <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$179,796 <br />TOTAL COST $528,811 <br />scoPtNG I oz <br />Architectural: <br />Landscape, hardscape, and concrete patio at the north side of <br />the building <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />New power and lighting will be provided for accent lighting at <br />site walkways. Power circuits will be served from the existing <br />branch panels located in the main electrical room <br />Electrical: