Laserfiche WebLink
SCOPE: SITE WEST <br />Thls cption reoresents tne cost to connplete the Iancscape. <br />narclsiape, an'd asnhalt r,vonk ai the backside of the buildin'g <br />1. CONSTRUCTTON COSTS $'181,271 <br />Excavation <br />Asphalt Paving @ Alley <br />Concrete Paving <br />Concrete Benches <br />Landscaping <br />lrrigation <br />Electrical <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$93,382 <br />TGTAL COsT $ACI6,97S <br />SCOPING lmz <br />Architectural: <br />Landscape, hardscape, and asphalt works at the rear ofthe <br />building <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />New power and lighting will be provided for accent lighting at <br />planned seating benches. Power circuits will be served from <br />the existing branch panels located in the main electrical room. <br />Electrical: