Laserfiche WebLink
SCOPE: SITE EAST <br />This option represents the cost to complete the landscape and <br />hardscape work at the main entrance. <br />To cornplete this scope the Heat Flant Occupancy scope needs to <br />be completed first. <br />1. CONSTRUCTTON COSTS $268,600 <br />Excavation <br />Concrete Paving <br />Concrete Benches <br />Landscaping <br />lrrigation <br />Electrical <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$138,155 <br />TOTAL COST $406,970 <br />scoPrNG I oz <br />Architectural: <br />Landscape and hardscape as part of the main entry sequence <br />to the building. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />New power and lighting will be provided for accent lighting at <br />planned seating benches. Power circuits will be served from <br />the existing branch panels located in the main electrical room. <br />Electrical: