My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-088
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
R2026-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 12:25:16 PM
Creation date
5/27/2026 12:24:02 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE: COAL BIN BUILD.OUT <br />This option represents the base cost to create an occuplable <br />spac_e on the coai bin ievel. This space will have a max occLipancy <br />of a9 Cue to the singie exit. <br />While the space will be occr:piabie frorn a building code <br />perspective, this saope does not inc!ude interior build-out. <br />Tc cornplete this scope the Warrn Sheli, Heat Flant Cccupancy, <br />and lVlezzanine scopbs needs to be cornpleted first. <br />1. CONSTRUCTTON COSTS s747,673 <br />Concrete Slab <br />Stair 4 Modifications <br />New Exterior Windows <br />Mechanical <br />Fire Protection <br />Electrical <br />2. SOFT COSTS <br />(Sales Tax, Permit Fees, Etc.) <br />$385,165 <br />TOTAL COST sn.132.E38 <br />scoPrNG I nz <br />This option includes a new steel floor structure and composite <br />concrete deck, new exterior windows to introduce day <br />lighting, modifications to the spiral stair (stair 4), and the <br />addition of a secondary egress route for the mezzanine level. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: This option includes the indoor VRF fan coils, <br />outdoor VRF heat pump, louvers, refrigerant piping, and <br />all required refrigerant accessories, branch ductwork, and <br />controls to provide a warm shell of this area once the floor <br />slab is added as part of this scope bucket. <br />Plumbing: No scope is included. <br />Fire Sprinkler: Sprinkler mains and heads to support an <br />ordinary hazard group 'l density included, with final head <br />layout to follow as part of the future tenant build-out. <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the coal bin for occupancy. <br />Permanent lighting will be installed where future ceilings are <br />open to structure. Mechanical connections will be provided <br />to support planned mechanical improvements. Power circuits <br />will be served from the existing branch panels located in the <br />main electrical room. Fire alarm devices will be served from <br />the existing FACP. <br />Electrical <br />Architectural:
The URL can be used to link to this page
Your browser does not support the video tag.