Laserfiche WebLink
The Old Heat Plant on CentralWashington <br />University's campus has undergone partial <br />renovations and multiple feasibility studies <br />over the years. Building on this existing body <br />of work, lntegrus developed a series of high- <br />level cost estimates to support potential future <br />development of the facility. This strategy is <br />intended to establish a path forward to a flexible <br />and code-compliant base building that can <br />accommodate future tenant improvements. <br />Funded by grants and/or sponsorship-driven <br />build-outs, ultimately enabling the transformation <br />of the structure into a Business lnnovation Center <br />To organize the scope and clearly define areas of <br />work, the project is divided into ten scopes. Each <br />represents a distinct component of the building <br />or site and will be further expanded upon in the <br />following pages. <br />The costs assume the project design starts on <br />02/2026 with two years of escalation factored in <br />to the mid point of construction. lf the project <br />does not start now additional costs would be <br />incu rred. <br />CONSTRUCTION COSTS <br />SUMMARY I Ot <br />3 <br />1. WARM SHELL <br />2. HEAT PLANT OCCUPANCY <br />3. ANNEX OCCUPANCY <br />4. MEZZANINE BUILD OUT <br />5. COAL BIN BUILD OUT <br />5. SITE EAST <br />7. SITE WEST <br />8. SITE NORTH <br />9. INTERIOR GLAZED BLOCK <br />10. ANNEX RESTROOMS <br />TOTAL COST <br />$2,630,350 <br />$3,833,829 <br />s292,156 <br />$901,833 <br />$1,132,838 <br />$406,97A <br />$274,653 <br />$528,811 <br />$355,545 <br />$208,100 <br />$10,565,085 <br />CWU OLD HEAT GRANT SUPPORT