There are architectural pieces of Old Heat that have been salvaged or retained in
<br />the building during phases I and llof the construction projects. These pieces can
<br />be used in the adaptive reuse of the building to bring the history and character of
<br />the building to life when renovated with four overarching objectives that guide the
<br />project's design, partnerships, and outcomes:
<br />Table 2: Build Detail
<br />2025 Cost d Prewiling W*e (45%l
<br />s 1,891,938.83
<br />5 395,514.33
<br />s 25r,622.4L
<br />s 210,658.51
<br />s 436,224.67
<br />s 404,rL5.29
<br />s 1,076,394.60
<br />s 124,400.50
<br />s 383,613.38
<br />$655,r72.42
<br />$1,098,185.49
<br />$94,0?I.99
<br />s 332,666.25
<br />$L36,818.38
<br />s t,146JU.77
<br />$t,I57,740.25
<br />s 299,593.06
<br />s 9,805,872.15
<br />2025 Escalated Cost (45%l
<br />s t,645,164.20
<br />$343,925.50
<br />5 227,497.V5
<br />$183,181.40
<br />$379,325.80
<br />s 351,404.60
<br />s 935,995.30
<br />$108,174.35
<br />s 333,576.85
<br />s 569,715.L5
<br />5 954,943.90
<br />$81,758.25
<br />5 289,275.00
<br />$1_1_8,972.50
<br />s 997,2A4J5
<br />5 1,,005,730.65
<br />$250,515.70
<br />5 8,526845.35
<br />2018 Bid
<br />$ t,t34,596.00
<br />S 2:z,tgo.oo
<br />S 156,895.00
<br />$ tzs,Egz.oo
<br />$ zet,eo+.oo
<br />$ z+z,l+g.oo
<br />$ e+s,stq.oo
<br />s 74,603.00
<br />$ z3o,o53.oo
<br />S lgz,goz.oo
<br />5 os8,58z.oo
<br />s 56,385.00
<br />5 tgg,soo.oo
<br />$ gz,oso.oo
<br />s 687,727.00
<br />5 o9+,zgz.oo
<br />S 179,66G.00
<br />S s,880,5$.m
<br />Divbion ltem
<br />GG Soft Costs (OH&P, lnsurance, Bonding, B&O tax)
<br />Existing Conditions (demo and abatement)
<br />Earthwork
<br />Exterior lmprovements
<br />Concrete
<br />Masonry
<br />Metals
<br />Wood and Plastic
<br />Thermal and Moisture Protection
<br />Doors and Windows
<br />Finishes
<br />Specialties
<br />Conveyance
<br />Fire Protection
<br />Plumbins and Mechanical
<br />Electrical
<br />Design Contingency
<br />TOTAIS
<br />Old Heat CERB Feasibility Study | 25
|