Laserfiche WebLink
Click here to view or download the original January 29 Comprehensive Plan Draft <br /> Click here to view or download the original January 29 Easton Subarea Plan Draft <br /> The following provides a summary of the proposed changes.Attachment A to this memorandum outlines the <br /> specific amendments for consideration.These proposed amendments are also available to the public as part <br /> of the comment period for the BOCC public hearing. <br /> • Batch#1 includes the Planning Commission recommended amendments to January 29 Draft <br /> Comprehensive Plan <br /> Comment:This batch includes Planning Commission recommended amendments to January 29 <br /> Draft Comprehensive Plan except those included in Batch#2. <br /> • Batch#2 includes additional recommended Planning Commission amendments to January 29 <br /> Comprehensive Plan draft(Amendments proposed by Commissioner Pat Deneen) <br /> Comment:This batch includes additional recommended Planning Commission amendments.These <br /> amendments were proposed by Planning Commissioner Deneen. These amendments were <br /> separated from Batch#1 because CDS and PW are not recommending all the proposed changes in <br /> Barch#2 be adopted by the Board of County Commissioners. <br /> Batch#3 outlines those changes within Batch#2 which CDS and PW recommend for final adoption. <br /> If Batch#2 is adopted Batch#3 would not be adopted If Batch#3 is adopted Batch#2 would not be <br /> adopted.The BOCC also has the option of not adopting either Batch or making additional changes. <br /> • Batch#3 CDS and Public Works recommended amendments to Batch#2(Amendments <br /> proposed by Commissioner Pat Deneen) <br /> Comment:Please see batch#2 comments.Batch#3 includes recommended amendments from <br /> CDS and PW to the Planning Commission recommended amendments proposed by Planning <br /> Commissioner Deneen. <br /> If Batch#3 is adopted Batch#2 would not be adopted If Batch#2 is adopted.Batch#3 would not be <br /> adopted,The BOCC also has the option of not adopting either Batch or making additional changes. <br /> • Batch#4 CDS recommended edits to January 29 Comprehensive Plan(Substantive Changes) <br /> Comment:Batch#4 includes CDS recommended changes based upon public comments received on <br /> the Draft Comprehensive Plan. <br /> • Batch#5 CDS recommended edits to January 29 Comprehensive Plan(Substantive Changes to <br /> Easton Subarea Plan) <br /> Comment:Batch#5 includes CDS recommended edits based upon public comments received on <br /> the Draft Comprehensive Plan specific to the new Easton Subarea Plan. <br /> • • 2828 Colby200, Everett,W, - - <br />