Laserfiche WebLink
23CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: ANNEX RESTROOMS <br />This option represents the cost to add two single occupancy restrooms to the Annex side of the building. <br />This work requires the Warm Shell and Annex Slab scopes to be completed. <br />1. CONSTRUCTION COSTS $137,346 <br /> Interior Framing <br /> Interior Finishing <br /> Plumbing Fixtures <br /> Toilet Accessories <br /> MEPF (mechanical, electrical, plumbing, fire protection) <br />2. SOFT COSTS $70,754 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $208,100 <br />Architectural: <br />Two single occupancy restrooms. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: This option includes all branch level ductwork, <br />single duct terminal units, GRDs, building controls, and heating <br />water piping to support the bucket’s build-out areas. <br />Plumbing: All Level 0 above grade plumbing to service the <br />areas outlined in this scope are previously completed. All <br />water, waste, and vent piping, fixtures, valves, and balancing <br />of hot water recirculation system is included to support this <br />scope’s build-out areas. <br />Fire Sprinkler: All sprinkler piping and heads required to <br />service this bucket’s build-out areas <br />Electrical: <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the planned restrooms. <br />Permanent lighting will be installed in finished areas. <br />Mechanical connections will be provided to support planned <br />mechanical improvements. Power circuits will be served from <br />the existing branch panels located in the main electrical room. <br />Fire alarm devices will be served from the existing FACP.