Laserfiche WebLink
21CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: INTERIOR GLAZED BLOCK <br />This option represents the cost to reinforce, salvage, repair, and reinstall the historic glazed block on the interior of the building. <br />This option is required to provide a safe occupiable building interior. It is recommended that this work be completed once the Warm Shell and Heat Plant Occupancy scopes are complete. <br />1. CONSTRUCTION COSTS $234,660 <br /> Reinforcing Extg Glazed Block <br /> Salvage Glazed Block <br /> Install Salvaged Block <br />2. SOFT COSTS $120,885 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $355,545 <br />Architectural: <br />Interior finishing of the Heat Plant. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />Electrical: <br />No scope is included.