Laserfiche WebLink
19CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: SITE NORTH <br />This option represents the cost to complete the landscape, hardscape, and concrete patio at the north side of the building. <br />It is required to bring the north exit of the Heat Plant up to code. Providing a secondary accessible means of egress. <br />This cost is based on the previous design however a more modest design could achieve the code requirements for egress and be a cost savings. <br />1. CONSTRUCTION COSTS $349,015 <br /> Excavation <br /> Concrete Patio & Ramp <br /> Concrete Paving <br /> Landscaping <br /> Irrigation <br /> Electrical <br />2. SOFT COSTS $179,796 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $528,811 <br />Architectural: <br />Landscape, hardscape, and concrete patio at the north side of <br />the building <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />Electrical: <br />New power and lighting will be provided for accent lighting at <br />site walkways. Power circuits will be served from the existing <br />branch panels located in the main electrical room