Laserfiche WebLink
17CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: SITE WEST <br />This option represents the cost to complete the landscape, hardscape, and asphalt work at the backside of the building. <br />1. CONSTRUCTION COSTS $181,271 <br /> Excavation <br /> Asphalt Paving @ Alley <br /> Concrete Paving <br /> Concrete Benches <br /> Landscaping <br /> Irrigation <br /> Electrical <br />2. SOFT COSTS $93,382 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $406,970 <br />Architectural: <br />Landscape, hardscape, and asphalt works at the rear of the <br />building <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />Electrical: <br />New power and lighting will be provided for accent lighting at <br />planned seating benches. Power circuits will be served from <br />the existing branch panels located in the main electrical room.