Laserfiche WebLink
15CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: SITE EAST <br />This option represents the cost to complete the landscape and hardscape work at the main entrance. <br />To complete this scope the Heat Plant Occupancy scope needs to be completed first. <br />1. CONSTRUCTION COSTS $268,600 <br /> Excavation <br /> Concrete Paving <br /> Concrete Benches <br /> Landscaping <br /> Irrigation <br /> Electrical <br />2. SOFT COSTS $138,165 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $406,970 <br />Architectural: <br />Landscape and hardscape as part of the main entry sequence <br />to the building. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: No scope is included. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />Electrical: <br />New power and lighting will be provided for accent lighting at <br />planned seating benches. Power circuits will be served from <br />the existing branch panels located in the main electrical room.