Laserfiche WebLink
11CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: MEZZANINE BUILD-OUT <br />This option represents the base cost to create an occupiable space on the mezzanine level. The space could fit a maximum of 49 occupants until the Coal Bin Build-out scope is completed. <br />While the space will be occupiable from a building code perspective, this scope does not include interior build-out. <br />While the structural steel for this level is included in the Heat Plant Occupancy phase, due to its relationship to the elevator, the finishing will not be complete until this phase. <br />To complete this scope the Warm Shell and Heat Plant Occupancy scopes needs to be completed first. <br />1. CONSTRUCTION COSTS $595,210 <br /> Deck Framing <br /> Guard Rail <br /> Mechanical <br /> Fire Protection <br /> Electrical <br />2. SOFT COSTS $306,623 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $901,833 <br />Architectural: <br />This option includes the build out of the mezzanine guard rails, <br />as well as various demo and cleanup of existing items. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: This option includes the indoor variable <br />refrigerant flow (VRF) fan coils, outdoor VRF heat pumps, <br />energy recovery ventilator (ERV) roof cowls, refrigerant piping, <br />and all required refrigerant accessories to support the future <br />build-out of the area. Final branch ductwork, GRDs, and <br />building controls connected to the VRF system to service the <br />full build-out of the Mezzanine will be provided as part of the <br />future TI. Heating of this level from the existing air handler will <br />be provided as part of the Bucket 1 scope. <br />Plumbing: No scope is included. <br />Fire Sprinkler: Sprinkler mains and heads to support an <br />ordinary hazard group 1 density included, with final head <br />layout to follow as part of the future tenant build-out. <br />Electrical: <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the mezzanine for occupancy. <br />Permanent lighting will be installed where future ceilings are <br />open to structure. Mechanical connections will be provided <br />to support planned mechanical improvements. Power circuits <br />will be served from the existing branch panels located in the <br />main electrical room. Fire alarm devices will be served from <br />the existing FACP.