My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4_CWU Tech Transfer Agenda 20260519
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
4_CWU Tech Transfer Agenda 20260519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:51 PM
Creation date
5/14/2026 12:03:42 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: MEZZANINE BUILD-OUT <br />This option represents the base cost to create an occupiable space on the mezzanine level. The space could fit a maximum of 49 occupants until the Coal Bin Build-out scope is completed. <br />While the space will be occupiable from a building code perspective, this scope does not include interior build-out. <br />While the structural steel for this level is included in the Heat Plant Occupancy phase, due to its relationship to the elevator, the finishing will not be complete until this phase. <br />To complete this scope the Warm Shell and Heat Plant Occupancy scopes needs to be completed first. <br />1. CONSTRUCTION COSTS $595,210 <br /> Deck Framing <br /> Guard Rail <br /> Mechanical <br /> Fire Protection <br /> Electrical <br />2. SOFT COSTS $306,623 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $901,833 <br />Architectural: <br />This option includes the build out of the mezzanine guard rails, <br />as well as various demo and cleanup of existing items. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: This option includes the indoor variable <br />refrigerant flow (VRF) fan coils, outdoor VRF heat pumps, <br />energy recovery ventilator (ERV) roof cowls, refrigerant piping, <br />and all required refrigerant accessories to support the future <br />build-out of the area. Final branch ductwork, GRDs, and <br />building controls connected to the VRF system to service the <br />full build-out of the Mezzanine will be provided as part of the <br />future TI. Heating of this level from the existing air handler will <br />be provided as part of the Bucket 1 scope. <br />Plumbing: No scope is included. <br />Fire Sprinkler: Sprinkler mains and heads to support an <br />ordinary hazard group 1 density included, with final head <br />layout to follow as part of the future tenant build-out. <br />Electrical: <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the mezzanine for occupancy. <br />Permanent lighting will be installed where future ceilings are <br />open to structure. Mechanical connections will be provided <br />to support planned mechanical improvements. Power circuits <br />will be served from the existing branch panels located in the <br />main electrical room. Fire alarm devices will be served from <br />the existing FACP.
The URL can be used to link to this page
Your browser does not support the video tag.