My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4_CWU Tech Transfer Agenda 20260519
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
4_CWU Tech Transfer Agenda 20260519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:51 PM
Creation date
5/14/2026 12:03:42 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: HEAT PLANT OCCUPANCY <br />This option represents the base cost to create an occupiable interior space on the heat plant side of the building. While the space will be occupiable from a building code perspective, this scope does not include interior build-out. <br />To complete this scope the Warm Shell scope needs to be completed first. <br />Interior Glazed Block Scope would also need to be completed for safe occupancy. <br />The Annex would not be occupiable under this scope. <br />1. CONSTRUCTION COSTS $2,530,327 <br /> Heat Plant Slab <br /> Lobby Slab <br /> Lower Level Restrooms <br /> New Curtain-wall @ Entry <br /> New Entry Vestibule <br /> Interior Lobby Wall Finishes <br /> Elevator <br /> Structural Steel <br /> Stairs 1-3 <br /> MEPF (mechanical, electrical, plumbing, fire protection) <br />2. SOFT COSTS $1,303,502 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $3,833,829 <br />Architectural: <br />This option includes the build-out and detailing of the entry <br />lobby and vestibule, central restrooms, heat plan slab, Stair <br />1-3, elevator and all structural steel. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />Mechanical: This option includes all branch level ductwork, <br />single duct terminal units, rooftop exhaust fan, GRDs, DX split <br />system servicing the elevator machine room, building controls, <br />and heating water piping to support the bucket’s build-out <br />areas. <br />Plumbing: All Level 0 below grade plumbing to service the <br />areas outlined in this scope was completed previously. All <br />water, waste, and vent piping, fixtures, valves, and balancing <br />of hot water recirculation system is included to support this <br />scope’s build-out areas. <br />Additionally, this option includes below grade waste and vent <br />piping for future fixtures located in 004 Custodial and 012 <br />Break Room. <br />Fire Sprinkler: All sprinkler piping and heads required to <br />service this bucket’s build-out areas. <br />Electrical: <br />New power, data, lighting and fire alarm systems will be <br />provided for the construction of the heating plant interior <br />walls and full build-out of specific areas noted as having <br />final finishes. Permanent lighting will be installed in finished <br />areas and areas where future ceilings are open to structure. <br />Mechanical connections will be provided to support planned <br />mechanical improvements. Elevator power, data and fire <br />alarm connections will be provided. Power circuits will be <br />served from the existing branch panels located in the main <br />electrical room. Fire alarm devices will be served from the <br />existing FACP.
The URL can be used to link to this page
Your browser does not support the video tag.