My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4_CWU Tech Transfer Agenda 20260519
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
4_CWU Tech Transfer Agenda 20260519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:51 PM
Creation date
5/14/2026 12:03:42 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5CWU OLD HEAT GRANT SUPPORT <br />SCOPING 02 <br />SCOPE: WARM SHELL <br />This scope represents the base cost to provide heating to the facility and achieve a warm shell. <br />This scope does not create occupiable interior space and is solely exterior modifications to enclose the building. <br />This cost does not include cleaning of the exterior brick. <br />We recommend that this scope be completed first. <br />1. CONSTRUCTION COSTS $1,736,031 <br /> Abatement <br /> New Exterior Windows <br /> Exterior Wall & Floor Infill <br /> New Roof on Steam Plant <br /> Ext. Cladding at Smoke Duct <br /> Mechanical <br /> Electrical <br />2. SOFT COSTS $894,319 <br /> (Sales Tax, Permit Fees, Etc.) <br />TOTAL COST $2,630,350 <br />Architectural: <br />This scope includes abatement of the building, new <br />exterior windows on the Heat Plant (new annex <br />windows were previously installed), exterior wall and <br />floor infill at the Ash Tank, new roof at the Heat Plant, <br />roof repairs at the annex, and exterior cladding to <br />enclose the smoke duct running from the heat plant <br />to the smoke stack. <br />Mechanical, Plumbing, and Fire Sprinkler Scope: <br />The previously completed project included the <br />installation of the central building air handler, heating <br />system, and cooling system. The equipment has not <br />been started but appeared to be in good condition in <br />February 2026. <br />HVAC: Branch level ductwork, single duct <br />terminal boxes, heating water piping to single <br />duct terminal units, rooftop exhaust fan, grilles, <br />registers, diffusers (GRDs), controls to support <br />activated equipment, and equipment startup and <br />commissioning are included to achieve a warm <br />shell. <br />Plumbing: No scope is included. <br />Fire Sprinkler: No scope is included. <br />Electrical: <br />New power and fire alarm systems will be provided <br />for the construction of exterior walls as part of the <br />heating plant envelope. Mechanical connections <br />will be provided to support planned mechanical <br />improvements. Power circuits will be served from the <br />existing branch panels located in the main electrical <br />room. Conduit pathways for future roof mounted PV <br />array will be installed during the roofing work. Fire <br />alarm devices will be served from the existing FACP.
The URL can be used to link to this page
Your browser does not support the video tag.