My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E26-241 Kittitas County 25EMPG-Partially Signed
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
E26-241 Kittitas County 25EMPG-Partially Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:39 PM
Creation date
5/14/2026 12:03:28 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge FFY25 EMPG (Emergency Management Performance Grant) Agreement E26-241
Order
6
Placement
Consent Agenda
Row ID
144485
Type
Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DHS-FEMA-EMPG-FY25 Page 6 of 50 Kittitas County, E26-241 <br />ii. All equipment, and supplies as applicable, purchased under this Agreement will <br />be recorded and maintained in the Subrecipient’s inventory system. <br />iii. Inventory system records shall include: <br />A. Description of the property. <br />B. Manufacturer’s serial number, or other identification number. <br />C. Funding source for the property, including the Federal Award Identification <br />Number (FAIN) (Face Sheet, Box 11). <br />D. Assistance Listings Number (Face Sheet, Box 13). <br />E. Who holds the title. <br />F. Acquisition date. <br />G. Cost of the property and the percentage of federal participation in the cost. <br />H. Location, use, and condition of the property at the date the information was <br />reported. <br />I. Disposition data including the date of disposal and sale price of the <br />property. <br />iv. The Subrecipient shall take a physical inventory of the equipment, and supplies <br />as applicable, and reconcile the results with the property records at least once <br />every two years. Any differences between quantities determined by the physical <br />inspection and those shown in the records shall be investigated by the <br />Subrecipient to determine the cause of the difference. The Subrecipient shall, in <br />connection with the inventory, verify the existence, current utilization, and <br />continued need for the equipment. <br />v. The Subrecipient shall be responsible for any and all operational and <br />maintenance expenses and for the safe operation of the equipment and supplies <br />including all questions of liability. The Subrecipient shall develop appropriate <br />maintenance schedules and procedures to ensure the equipment, and supplies <br />as applicable, are well maintained and kept in good operating condition. <br />vi. The Subrecipient shall develop a control system to ensure adequate safeguards <br />to prevent loss, damage, and theft of the property. Any loss, damage, or theft shall <br />be investigated, and a report generated and sent to the Department’s Key <br />Personnel. <br />vii. The Subrecipient must obtain and maintain all necessary certifications and <br />licenses for the equipment. <br />viii. If the Subrecipient is authorized or required to sell the property, proper sales <br />procedures must be established and followed to ensure the highest possible <br />return. For disposition, if upon termination or at the Grant Agreement End Date, <br />when original or replacement supplies or equipment acquired under a federal <br />award are no longer needed for the original project or program or for other <br />activities currently or previously supported by a federal awarding agency, the <br />Subrecipient must comply with the following procedures: <br />A. For Supplies: If there is a residual inventory of unused supplies exceeding <br />$10,000 in total aggregate value upon termination or completion of the <br />project or program and the supplies are not needed for any other federal <br />award, the Subrecipient must retain the supplies for use on other activities <br />or sell them, but must, in either case, compensate the federal government <br />for its share. The amount of compensation must be computed in the same <br />manner as for equipment. <br />B. For Equipment:
The URL can be used to link to this page
Your browser does not support the video tag.