Laserfiche WebLink
Rodeo Arena Seating Project <br />29 <br />Not accepted <br />C07 <br />30 <br />$ 30,865.69 <br />Additional Pickets at east and west ramps. <br />C07 <br />31 <br />$ 7,217.91 <br />Revised Circuits breakers for Stage and Bar Equipment <br />C07 <br />32 <br />$ 20,018.38 <br />South walkway bridge landing <br />33 <br />$ 178,668.66 <br />Over Excavation & Structural Fill <br />34 <br />$ (40,664.53) <br />Delete lights and fixtures on Fence line and circuiting <br />35 <br />$ 4,335.30 <br />Find and connect old waterlines <br />36 <br />$ 25,008.99 <br />PIV Valve per City <br />37 <br />$ (6,542.97) <br />Credit for not using Cast Iron piping <br />base + alternate <br />$ 5,065,000.00 <br />Total Proposed <br />Changes <br />$ 1,377,235.06 <br />Subtotal <br />WSST <br />Total <br />Change Order <br />No 1 <br />$ 21,729.74 <br />$ 1,825.30 <br />$ 23,555.04 <br />Change Order No 2 <br />$167,807.12 <br />$ 14,095.80 <br />$ 181,902.92 <br />Change Order No 3 <br />$115,268.29 <br />$ 9,682.54 <br />$ 124,950.83 <br />Change Order No 4 <br />$198,052.15 <br />$ 16,636.38 <br />$ 214,688.53 <br />Change Order No 5 <br />$683,028.92 <br />$ 57,374.43 <br />$ 740,403.35 <br />