Laserfiche WebLink
Working yedr-round to reduce <br />wi ldfi re risk <br />Strengthening the grid <br />Replacing and upgrading equipment, including replacing poles, installing "tree wire" and <br />strategically undergrounding power I i nes. <br />Vegetation management <br />Trimming or removing hazardous trees and vegetation that grows too close to power <br />lines, annually on high-risk lines. <br />Pre-season patrols and maintenance <br />Inspecting high-risk lines annually to identify damage that may have occurred during <br />winter storm season and perform maintenance before wildfire season. <br />3April 2026