My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G - Fully Executed
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
G - Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:38:45 PM
Creation date
5/12/2026 12:38:36 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Task Order No. 3 with Ardurra Group, Inc. for the Hungry Junction Road Project
Order
7
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation On-Gall Ardurra Group, lnc <br />General Assumptions and Exclusions <br />The following are a list of assumptions that apply to this scope of work and services that are <br />specifically excluded from this agreement, but may be added by written authorization of the <br />Client: <br />Ardurra Design: <br />a Exclusions and/or Additional Services: <br />. Master Planning and/or Capital lmprovement Planning. <br />. Ordinancepreparation. <br />. Any other review submiftals not specifically identified in the list of deliverables. <br />. Funding Applications <br />. Construction management. <br />. Environmental permitting and documentation. <br />. Cultural Resources work. <br />. Geotechnicalwork. <br />o Structuralwork. <br />. Topographical surveying or base mapping. <br />. Right of way delineation <br />. Title reports. <br />. Environmental mitigation or cleanup. <br />. Traffic control <br />r Legal services. <br />o Agency submittal fees, review fees or permit fees. <br />. Client inspired changes or unforeseen changes arising due to regulatory decisions. <br />. Any services, product or professional responsibility not specifically described above. <br />Page 10 of10
The URL can be used to link to this page
Your browser does not support the video tag.