My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dev Regs Report_from Study Session
>
Meetings
>
2026
>
05. May
>
2026-05-12 6:00 PM - Planning Commission Public Hearing
>
Dev Regs Report_from Study Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:38 AM
Creation date
5/8/2026 10:15:16 AM
Metadata
Fields
Template:
Meeting
Date
5/12/2026
Meeting title
Planning Commission Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Uses. Allowed uses within an MID shall be predominantly industrial, manufacturing, energy or <br />natural resource -based in character. Commercial uses that support allowed uses located within a <br />MID are also allowed. Uses authorized for a MID shall be included and defined within the <br />development agreement. <br />3. Buffers/Open Space. The MID shall contain setbacks and open space that will serve to separate <br />and buffer the MID from adjacent rural areas or resource lands and to protect critical areas. Setbacks <br />and open space shall be defined within the development agreement; <br />4. Services and Facilities: The MID shall provide facilities and services necessary to meet the on -site <br />needs of businesses and employees, including but not limited to water, sanitary sewer, drainage, <br />power, telecommunications and solid waste; <br />17.38.050 Applications/approvals required for new major industrial developments. <br />1. A major industrial development may be authorized by the county through the approval of a <br />development agreement as authorized by KCC Chapter 15A.11, Development Agreements, and <br />RCW 36.70B.170 through 36.70B.210, by the Board of County Commissioners Consistent with KCC <br />15A.11.020(B) and RCW 36.70B.170, the development agreement approved by the Board must set <br />forth the development standards applicable to the development of a specific major industrial <br />developments, which may include, but are not limited to: (1) permitted uses, densities and intensities <br />of uses, and building sizes; (2) phasing of development, if requested by the applicant; (3) procedures <br />for review of site -specific development plans; (4) provisions for services and facilities applicable to <br />major industrial developments; (5) mitigation measures imposed pursuant to the State Environmental <br />Policy Act, Chapter 43.21 C RCW, and other development conditions; and (6) other development <br />standards including those identified in KCC 15A.11.020(E) and RCW 36.70B.170(3). <br />2. Required applications/approvals. In addition to approval of a MID development permit and a <br />development agreement as set forth in section 1, a major industrial development shall require the <br />following approvals from the county: (1) a site -specific amendment of the comprehensive plan land <br />use designation map to major industrial development; provided, that the sub -area planning process <br />described in Chapter 1 of the county comprehensive plan and KCC Chapter 15B.03, Amendments to <br />Comprehensive Plan, may be used if deemed appropriate by the applicant and county; and (2) a <br />site -specific rezone of the county zoning map to major industrial development overlay zoning district <br />pursuant to KCC Chapter 17.98, Amendments. The comprehensive plan amendment or subarea <br />plan and rezone may be processed by the county concurrent with the major industrial development <br />permit and development agreement required for approval of a major industrial development. <br />3. Planned actions authorized. If deemed appropriate by the applicant and the county, a major <br />industrial development project may be designated by the county as a planned action pursuant to the <br />provisions of KCC Chapter 15A.09, Planned Actions. <br />17.38.060 Applications/approvals required for existing major industrial developments. <br />1. Designation. An existing major industrial development may be designated by the county as a <br />major industrial development, consistent with RCW 36.70A.365, RCW 36.70A.367, RCW 36.70A.368 <br />through approval of a sub -area plan, development plan, and adoption of an MID zoning overlay. The <br />sub -area plan, development plan, and applicable zoning shall establish the range of uses, and the <br />density, intensity and character of development that is permitted within the development. <br />2. Development applications. Following designation of the site as an MID, a property owner may <br />submit a site -specific development application to the County. A development agreement, consistent <br />with KCC Chapter 15A.11 and RCW 36.70B.170, may be submitted in conjunction with each <br />development application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.