Laserfiche WebLink
Architectural: <br /> •• • • - • _ • • Two single occupancy restrooms. <br /> • -• • . • • •. • • _ Mechanical, Plumbing, and Fire Sprinkler Scope: <br /> Mechanical: This option includes all branch level ductwork, <br /> single duct terminal units, GRDs, building controls, and heating <br /> water piping to support the bucket's build-out areas. <br /> Plumbing: All Level 0 above grade plumbing to service the <br /> areas outlined in this scope are previously completed.All <br /> water, waste, and vent piping, fixtures, valves, and balancing <br /> • • • ' • of hot water recirculation system is included to support this <br /> scope's build-out areas. <br /> Fire Sprinkler:All sprinkler piping and heads required to <br /> • service this bucket's build-out areas <br /> Electrical: <br /> •- New power, data, lighting and fire alarm systems will be <br /> provided for the construction of the planned restrooms. <br /> Permanent lighting will be installed in finished areas. <br /> • • Mechanical connections will be provided to support planned <br /> mechanical improvements. Power circuits will be served from <br /> the existing branch panels located in the main electrical room. <br /> Fire alarm devices will be served from the existing FACP. <br />