My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.11.2026 PW SS Briefing
>
Meetings
>
2026
>
05. May
>
2026-05-11 1:30 PM - Public Works Study Session
>
05.11.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:26 AM
Creation date
5/8/2026 10:08:57 AM
Metadata
Fields
Template:
Meeting
Date
5/11/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPING <br /> SCOPE: INTERIOR GLAZED BLOCK <br /> This option represents the cost to reinforce, salvage, repair, and <br /> reinstall the historic glazed block on the interior of the building. ' ' " <br /> This option is required to provide a safe occupiable building Mechanical, Plumbing, and Fire Sprinkler <br /> interior. It is recommended that this work be completed once the <br /> Warm Shell and Heat Plant Occupancy scopes are complete. included. <br /> included.Plumbing: No scope is <br /> included.Fire Sprinkler: No scope is <br /> included.No scope is <br /> 1. CONSTRUCTION COSTS $234,660 <br /> Reinforcing Extg Glazed Block <br /> Salvage Glazed Block <br /> Install Salvaged Block <br /> 2. SOFT COSTS $120,885 <br /> (Sales Tax, Permit Fees, Etc.) <br /> TOTAL COST $355,545 <br />
The URL can be used to link to this page
Your browser does not support the video tag.