My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.11.2026 PW SS Briefing
>
Meetings
>
2026
>
05. May
>
2026-05-11 1:30 PM - Public Works Study Session
>
05.11.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:26 AM
Creation date
5/8/2026 10:08:57 AM
Metadata
Fields
Template:
Meeting
Date
5/11/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPING <br /> SCOPE: SITE NORTH <br /> This option represents the cost to complete the landscape, <br /> hardscape, and concrete patio at the north side of the building. • ' concrete patio • north <br /> the building <br /> It is required to bring the north exit of the Heat Plant up to code. <br /> Providing a secondary accessible means of egress. = " <br /> This cost is based on the previous design however a more modestincluded. <br /> design could achieve the code requirements for egress and be a <br /> cost savings. included. <br /> included.Fire Sprinkler: No scope is <br /> 1. CONSTRUCTION COSTS $349,015 New power and lighting will be provided ' <br /> site walkways. Power circuits will be served from the existing <br /> Excavation branch panels located " <br /> Concrete Patio & Ramp <br /> Concrete Paving <br /> Landscaping <br /> Irrigation <br /> Electrical <br /> 2. SOFT COSTS $179,796 <br /> (Sales Tax, Permit Fees, Etc.) <br /> TOTAL COST $528,811 <br />
The URL can be used to link to this page
Your browser does not support the video tag.