Laserfiche WebLink
SCOPING <br /> SCOPE: SITE NORTH <br /> This option represents the cost to complete the landscape, <br /> hardscape, and concrete patio at the north side of the building. • ' concrete patio • north <br /> the building <br /> It is required to bring the north exit of the Heat Plant up to code. <br /> Providing a secondary accessible means of egress. = " <br /> This cost is based on the previous design however a more modestincluded. <br /> design could achieve the code requirements for egress and be a <br /> cost savings. included. <br /> included.Fire Sprinkler: No scope is <br /> 1. CONSTRUCTION COSTS $349,015 New power and lighting will be provided ' <br /> site walkways. Power circuits will be served from the existing <br /> Excavation branch panels located " <br /> Concrete Patio & Ramp <br /> Concrete Paving <br /> Landscaping <br /> Irrigation <br /> Electrical <br /> 2. SOFT COSTS $179,796 <br /> (Sales Tax, Permit Fees, Etc.) <br /> TOTAL COST $528,811 <br />