Laserfiche WebLink
Architectural: <br /> •. - • - •. • •. _ Z sm. • •. This option includes a new steel floor structure and composite <br /> • , • • _ • - concrete deck, new exterior windows to introduce day <br /> lighting, modifications to the spiral stair(stair 4), and the <br /> •. - • . • • , • • • • •• _ addition of a secondary egress route for the mezzanine level. <br /> Mechanical, Plumbing, and Fire Sprinkler Scope: <br /> • • •- - -• • • _ • • _._• Mechanical: This option includes the indoor VRF fan coils, <br /> outdoor VRF heat pump, louvers, refrigerant piping, and <br /> all required refrigerant accessories, branch ductwork, and <br /> controls to provide a warm shell of this area once the floor <br /> slab is added as part of this scope bucket. <br /> Plumbing: No scope is included. <br /> Fire Sprinkler: Sprinkler mains and heads to support an <br /> • •• ordinary hazard group 1 density included, with final head <br /> ' •• - • layout to follow as part of the future tenant build-out. <br /> • • Electrical: <br /> New power, data, lighting and fire alarm systems will be <br /> • • provided for the construction of the coal bin for occupancy. <br /> Permanent lighting will be installed where future ceilings are <br /> open to structure. Mechanical connections will be provided <br /> to support planned mechanical improvements. Power circuits <br /> • • will be served from the existing branch panels located in the <br /> main electrical room. Fire alarm devices will be served from <br /> the existing FACP. <br />