My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.11.2026 PW SS Briefing
>
Meetings
>
2026
>
05. May
>
2026-05-11 1:30 PM - Public Works Study Session
>
05.11.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:26 AM
Creation date
5/8/2026 10:08:57 AM
Metadata
Fields
Template:
Meeting
Date
5/11/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural: <br /> •. - • •. - • •. • This option includes the build out of the mezzanine guard rails, <br /> • • •. •. • • • •- • • .• as well as various demo and cleanup of existing items. <br /> •. •- • •- • • - • • - - • • • Mechanical, Plumbing, and Fire Sprinkler Scope: <br /> • • .• Mechanical:This option includes the indoor variable <br /> • • •. • - • - • • • • , .• refrigerant flow(VRF)fan coils, outdoor VRF heat pumps, <br /> • • •. • • _ - • energy recovery ventilator(ERV) roof cowls, refrigerant piping, <br /> and all required refrigerant accessories to support the future <br /> • • • - • •- • • •, build-out of the area. Final branch ductwork, GRDs, and <br /> • •- _ -• • • . • • _• building controls connected to the VRF system to service the <br /> full build-out of the Mezzanine will be provided as part of the <br /> future TI. Heating of this level from the existing air handler will <br /> be provided as part of the Bucket 1 scope. <br /> Plumbing: No scope is included. <br /> Fire Sprinkler: Sprinkler mains and heads to support an <br /> _ ordinary hazard group 1 density included,with final head <br /> layout to follow as part of the future tenant build-out. <br /> Electrical: <br /> New power, data, lighting and fire alarm systems will be <br /> • • provided for the construction of the mezzanine for occupancy. <br /> Permanent lighting will be installed where future ceilings are <br /> open to structure. Mechanical connections will be provided <br /> • • to support planned mechanical improvements. Power circuits <br /> will be served from the existing branch panels located in the <br /> main electrical room. Fire alarm devices will be served from <br /> the existing FACP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.