Laserfiche WebLink
SCOPING <br /> SCOPE: ANNEX OCCUPANCY <br /> This option represents the base cost to create an occupiable <br /> interior space on the annex side of the building. " ' includes the build-out �' including <br /> below grade plumbing for two single occupancy restrooms <br /> While the space will be occupiable from a building code and one "" included <br /> perspective, this scope does not include interior build-out. <br /> Interior drywall/finishes would need to be added as part of future <br /> Tenant Improvement work. Sprinkler <br /> To complete this scope the Warm Shell scope needs to beincluded. <br /> completed first. Plumbing: All Level 0 below grade plumbing to service the <br /> Sprinkler:areas outlined in this bucket was completed previously. <br /> Fire No scope is included. <br /> 1. CONSTRUCTION COSTS $192,823 <br /> Annex Slab Build-up scope is _ <br /> d. <br /> Annex Slab ' • <br /> Plumbing Rough-in <br /> 2. SOFT COSTS $99,333 <br /> (Sales Tax, Permit Fees, Etc.) <br /> TOTAL COST $292,156 <br />