My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.11.2026 PW SS Briefing
>
Meetings
>
2026
>
05. May
>
2026-05-11 1:30 PM - Public Works Study Session
>
05.11.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:26 AM
Creation date
5/8/2026 10:08:57 AM
Metadata
Fields
Template:
Meeting
Date
5/11/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPING <br /> SCOPE: ANNEX OCCUPANCY <br /> This option represents the base cost to create an occupiable <br /> interior space on the annex side of the building. " ' includes the build-out �' including <br /> below grade plumbing for two single occupancy restrooms <br /> While the space will be occupiable from a building code and one "" included <br /> perspective, this scope does not include interior build-out. <br /> Interior drywall/finishes would need to be added as part of future <br /> Tenant Improvement work. Sprinkler <br /> To complete this scope the Warm Shell scope needs to beincluded. <br /> completed first. Plumbing: All Level 0 below grade plumbing to service the <br /> Sprinkler:areas outlined in this bucket was completed previously. <br /> Fire No scope is included. <br /> 1. CONSTRUCTION COSTS $192,823 <br /> Annex Slab Build-up scope is _ <br /> d. <br /> Annex Slab ' • <br /> Plumbing Rough-in <br /> 2. SOFT COSTS $99,333 <br /> (Sales Tax, Permit Fees, Etc.) <br /> TOTAL COST $292,156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.