My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.11.2026 PW SS Briefing
>
Meetings
>
2026
>
05. May
>
2026-05-11 1:30 PM - Public Works Study Session
>
05.11.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 11:39:26 AM
Creation date
5/8/2026 10:08:57 AM
Metadata
Fields
Template:
Meeting
Date
5/11/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural: <br /> • •. _ • • • _ • - .• ,• This option includes the build-out and detailing of the entry <br /> •. _ •- • • . • - • • • •• _ •_ _ lobby and vestibule, central restrooms, heat plan slab, Stair <br /> • •- • • _ • • - _ • • • •" 1-3, elevator and all structural steel. <br /> • • • _ _ • •- • •- --• • •- Mechanical, Plumbing, and Fire Sprinkler Scope: <br /> Mechanical:This option includes all branch level ductwork, <br /> • .• • • •. • • • _ _ • • • _ • • _ _• • single duct terminal units, rooftop exhaust fan, GRDs, DX split <br /> - • •. system servicing the elevator machine room, building controls, <br /> and heating water piping to support the bucket's build-out <br /> - • • • •- • • . • - • - • • - areas. <br /> Plumbing:All Level 0 below grade plumbing to service the <br /> areas outlined in this scope was completed previously.All <br /> water,waste, and vent piping,fixtures,valves, and balancing <br /> of hot water recirculation system is included to support this <br /> 1. CONSTRUCTION COSTS $2,530,327 scope's build-out areas. <br /> Heat Plant Additionally, this option includes below grade waste and vent <br /> Lobby Slab '' piping for future fixtures located in 004 Custodial and 012 <br /> Lower Level Restrooms Break Room. <br /> New Curtain-wall @ Entry Fire Sprinkler:All sprinkler piping and heads required to <br /> New Entry Vestibule service this bucket's build-out areas. <br /> LobbyInterior <br /> Elevator Electrical: <br /> Structural Steel <br /> Stairs 1-3 New power, data, lighting and fire alarm systems will be <br /> MEPF(mechanical, electrical, plumbing, _ protection) provided for the construction of the heating plant interior <br /> walls and full build-out of specific areas noted as having <br /> 2. SOFT COSTS $1,303,502 final finishes. Permanent lighting will be installed in finished <br /> (Sales Tax, Permit Fees, Etc.) areas and areas where future ceilings are open to structure. <br /> Mechanical connections will be provided to support planned <br /> mechanical improvements. Elevator power, data and fire <br /> TOTAL COST $3,833,829 alarm connections will be provided. Power circuits will be <br /> served from the existing branch panels located in the main <br /> electrical room. Fire alarm devices will be served from the <br /> existing FACP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.