Laserfiche WebLink
Architectural: <br /> • - , This scope includes abatement of the building, new <br /> exterior windows on the Heat Plant(new annex <br /> • • - • • - • - • • . • - - • •. - . • • - windows were previously installed), exterior wall and <br /> • •• • - • - - • • floor infill at the Ash Tank, new roof at the Heat Plant, <br /> roof repairs at the annex, and exterior cladding to <br /> • • • _ • • - -. • _ • • enclose the smoke duct running from the heat plant <br /> to the smoke stack. <br /> Mechanical, Plumbing, and Fire Sprinkler Scope: <br /> The previously completed project included the <br /> installation of the central building air handler, heating <br /> system, and cooling system. The equipment has not <br /> 1. CONSTRUCTION COSTSbeen started but appeared to be in good condition in <br /> February 2026. <br /> Abatement <br /> ExteriorNew •• HVAC: Branch level ductwork, single duct <br /> Exterior •• terminal boxes, heating water piping to single <br /> New Roof on duct terminal units, rooftop exhaust fan,grilles, <br /> Cladding at Smoke Duct registers, diffusers (GRDs), controls to support <br /> Mechanical activated equipment, and equipment startup and <br /> Electrical commissioning are included to achieve a warm <br /> shell. <br /> 2. SOFT COSTS <br /> (Sales Tax, •- Plumbing: No scope is included. <br /> Fire Sprinkler: No scope is included. <br /> TOTAL •ST $2,630,350 <br /> Electrical: <br /> New power and fire alarm systems will be provided <br /> for the construction of exterior walls as part of the <br /> heating plant envelope. Mechanical connections <br /> will be provided to support planned mechanical <br /> improvements. Power circuits will be served from the <br /> existing branch panels located in the main electrical <br /> room. Conduit pathways for future roof mounted PV <br /> array will be installed during the roofing work. Fire <br /> alarm devices will be served from the existing FACP. <br />