Laserfiche WebLink
SUMMARY <br /> The Old Heat Plant on Central Washington <br /> University's campus has undergone partial <br /> renovations and multiple feasibility studies <br /> over the years. Building on this existing body <br /> of work, Integrus developed a series of high- <br /> level cost estimates to support potential future <br /> development of the facility.This strategy is <br /> intended to establish a path forward to a flexible <br /> and code-compliant base building that can • ' ' ' <br /> accommodate future tenant improvements. <br /> Funded by grants and/or sponsorship-driven • <br /> build-outs, ultimately enabling the transformation <br /> of the structure into a Business Innovation Center. • • 1 ; <br /> To organize the scope and clearly define areas of • . • <br /> work,the project is divided into ten scopes. Each <br /> represents a distinct component of the building . , 1 • 1 <br /> or site and will be further expanded upon in the • <br /> following pages. • <br /> The costs assume the project design starts on <br /> 02/2026 with two years of escalation factored in • • ' <br /> to the mid point of construction. If the project <br /> does not start now additional costs would be • • D • ' <br /> incurred. <br />