My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-03-30-cds-study-session-supporting-documents
>
Meetings
>
2026
>
03. March
>
2026-03-30 2:30 PM - CDS Study Session
>
2026-03-30-cds-study-session-supporting-documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 5:24:07 PM
Creation date
5/4/2026 3:19:56 PM
Metadata
Fields
Template:
Meeting
Date
3/30/2026
Meeting title
CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comment #012 <br /> Easton Subarea Plan—Public Comment <br /> 5. CRITICAL AREAS PROTECTION: NON-NEGOTIABLE <br /> REQUIREMENTS <br /> Much of the Easton LAMIRD area sits within or adjacent to designated Critical Aquifer Recharge <br /> Areas (CARAs). The Easton Water District depends entirely on groundwater for its domestic <br /> and drinking water supply. The subarea plan must incorporate the following existing legal <br /> requirements and make them explicit in the development review process: <br /> Recommended subarea plan language: "No development application within a Type 3 <br /> LAMIRD shall be approved without a verified critical areas review that cross-references the <br /> County's Critical Area CARA maps and Group A Wellhead Protection Area maps. A finding of <br /> 'no critical areas'is insufficient without documented evidence that the County's own CARA <br /> maps, wellhead protection area designations, and Critical Areas Ordinance requirements have <br /> been reviewed and addressed. All proposals within or within 200 feet of a CARA shall comply <br /> with mitigation sequencing under KCC 17A.01.100 and use Best Available Science to protect <br /> groundwater resources." <br /> 6. CLEAR STATEMENT: WHAT YOU CAN AND CANNOT BUILD <br /> Based on the full legal framework above, here is a plain-language summary of what is and is not <br /> permissible on Type 3 LAMIRD land in the Easton area. I request that the subarea plan <br /> incorporate this distinction explicitly: <br /> WHAT YOU CAN BUILD <br /> • A small-scale commercial business that fits within 30,000 square feet of total use area <br /> • Retail uses that do not exceed 4,000 square feet <br /> • Development that keeps impervious surface at or below 33% of the lot <br /> • New business on a site with documented prior commercial occupancy <br /> • Uses that preserve the visual landscape of open spaces, forests, and farms <br /> • Uses compatible with adjacent resource lands, airports, local resort business, and <br /> outdoor recreation <br /> • Development that protects groundwater recharge areas and meets Best Available <br /> Science standards <br /> • Businesses that provide job opportunities for rural residents without requiring urban <br /> services <br /> WHAT YOU CANNOT BUILD <br /> • Any development exceeding 30,000 square feet of total use area <br /> • Any retail component exceeding 4,000 square feet <br /> • Any project with impervious surface coverage exceeding 33% of the lot <br /> • New commercial development on vacant or undeveloped land with no documented prior <br /> business use <br /> • Large-scale highway-oriented commercial facilities (travel centers, large fuel stations, <br /> multi-use commercial complexes) <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.