Laserfiche WebLink
HCM 7th TWSC <br />7: SR 906 & I-90 WB Ramp 06/09/2025 <br />PM Weekend Future - February 2045 3:33 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 7 <br />Intersection <br />Int Delay, s/veh 2.5 <br />Movement WBL WBR NBT NBR SBL SBT <br />Lane Configurations <br />Traffic Vol, veh/h 35 10 60 370 105 35 <br />Future Vol, veh/h 35 10 60 370 105 35 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Yield Yield Free Free Stop Stop <br />RT Channelized - Stop - Yield - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - 0 - - 0 <br />Grade, %0 - 0 - - 0 <br />Peak Hour Factor 75 75 91 91 83 83 <br />Heavy Vehicles, % 11 11 2 2 0 0 <br />Mvmt Flow 47 13 66 407 127 42 <br />Major/Minor Major1 Minor2 <br />Conflicting Flow All 0 0 66 66 <br /> Stage 1 - - 0 0 <br /> Stage 2 - - 66 66 <br />Critical Hdwy - - 6.4 6.5 <br />Critical Hdwy Stg 1 - - - - <br />Critical Hdwy Stg 2 - - 5.4 5.5 <br />Follow-up Hdwy - - 3.5 4 <br />Pot Cap-1 Maneuver - - 944 829 <br /> Stage 1 - - - - <br /> Stage 2 - - 962 844 <br />Platoon blocked, %- - <br />Mov Cap-1 Maneuver - - 944 0 <br />Mov Cap-2 Maneuver - - 944 0 <br /> Stage 1 - - - 0 <br /> Stage 2 - - 962 0 <br />Approach NB SB <br />HCM Control Delay, s/v 0 9.64 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBRSBLn1 <br />Capacity (veh/h)- - 944 <br />HCM Lane V/C Ratio - - 0.179 <br />HCM Control Delay (s/veh) - - 9.6 <br />HCM Lane LOS - - A <br />HCM 95th %tile Q(veh) - - 0.6