Laserfiche WebLink
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 06/09/2025 <br />PM Weekend Existing - February 2025 10:28 am 03/07/2025 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 3.7 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 47 1 148 0 0 0 0 294 38 7 46 0 <br />Future Vol, veh/h 47 1 148 0 0 0 0 294 38 7 46 0 <br />Conflicting Peds, #/hr 4 0 4 2 0 2 4 0 2 2 0 4 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length - - - - - - - - - - - - <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 88 88 88 87 87 87 92 92 92 88 88 88 <br />Heavy Vehicles, % 0 0 0 0 0 0 2 2 2 2 2 2 <br />Mvmt Flow 53 1 168 0 0 0 0 320 41 8 52 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 392 431 56 - 0 0 363 0 0 <br /> Stage 1 68 68 -- - - - - - <br /> Stage 2 324 363 -- - - - - - <br />Critical Hdwy 6.4 6.5 6.2 - - - 4.12 - - <br />Critical Hdwy Stg 1 5.4 5.5 -- - - - - - <br />Critical Hdwy Stg 2 5.4 5.5 -- - - - - - <br />Follow-up Hdwy 3.5 4 3.3 - - - 2.218 - - <br />Pot Cap-1 Maneuver 616 520 1016 0 - - 1196 - 0 <br /> Stage 1 960 842 -0 - - - - 0 <br /> Stage 2 738 628 -0 - - - - 0 <br />Platoon blocked, %- -- <br />Mov Cap-1 Maneuver 612 0 1013 - - - 1196 - - <br />Mov Cap-2 Maneuver 612 0 -- - - - - - <br /> Stage 1 960 0 -- - - - - - <br /> Stage 2 733 0 -- - - - - - <br />Approach EB NB SB <br />HCM Control Delay, s/v10.52 0 1.06 <br />HCM LOS B <br />Minor Lane/Major Mvmt NBT NBREBLn1 SBL SBT <br />Capacity (veh/h)- - 875 238 - <br />HCM Lane V/C Ratio - - 0.255 0.007 - <br />HCM Control Delay (s/veh) - - 10.5 8 0 <br />HCM Lane LOS - - B A A <br />HCM 95th %tile Q(veh) - - 1 0 -