Laserfiche WebLink
HCM 7th TWSC <br />7: SR 906 & I-90 WB Ramp 06/09/2025 <br />PM Weekday Future - February 2045 3:29 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 7 <br />Intersection <br />Int Delay, s/veh 1.3 <br />Movement WBL WBR NBT NBR SBL SBT <br />Lane Configurations <br />Traffic Vol, veh/h 55 5 25 170 20 10 <br />Future Vol, veh/h 55 5 25 170 20 10 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Yield Yield Free Free Stop Stop <br />RT Channelized - Stop - Yield - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - 0 - - 0 <br />Grade, %0 - 0 - - 0 <br />Peak Hour Factor 85 85 84 84 75 75 <br />Heavy Vehicles, % 43 43 1 1 0 0 <br />Mvmt Flow 65 6 30 202 27 13 <br />Major/Minor Major1 Minor2 <br />Conflicting Flow All 0 0 30 30 <br /> Stage 1 - - 0 0 <br /> Stage 2 - - 30 30 <br />Critical Hdwy - - 6.4 6.5 <br />Critical Hdwy Stg 1 - - - - <br />Critical Hdwy Stg 2 - - 5.4 5.5 <br />Follow-up Hdwy - - 3.5 4 <br />Pot Cap-1 Maneuver - - 990 867 <br /> Stage 1 - - - - <br /> Stage 2 - - 998 874 <br />Platoon blocked, %- - <br />Mov Cap-1 Maneuver - - 990 0 <br />Mov Cap-2 Maneuver - - 990 0 <br /> Stage 1 - - - 0 <br /> Stage 2 - - 998 0 <br />Approach NB SB <br />HCM Control Delay, s/v 0 8.79 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBRSBLn1 <br />Capacity (veh/h)- - 990 <br />HCM Lane V/C Ratio - - 0.04 <br />HCM Control Delay (s/veh) - - 8.8 <br />HCM Lane LOS - - A <br />HCM 95th %tile Q(veh) - - 0.1