My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />5: Hyak Dr E & SR 906 & Driveway 06/09/2025 <br />PM Weekday Future - February 2045 3:29 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 5 <br />Intersection <br />Int Delay, s/veh 8.3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 45 5 50 5 10 60 65 130 5 15 75 40 <br />Future Vol, veh/h 45 5 50 5 10 60 65 130 5 15 75 40 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br />RT Channelized - - None - - None - - None - - None <br />Storage Length - - - - - - - - - - - - <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 88 88 88 75 75 75 87 87 87 87 87 87 <br />Heavy Vehicles, % 1 1 1 23 23 23 1 1 1 2 2 2 <br />Mvmt Flow 51 6 57 7 13 80 75 149 6 17 86 46 <br />Major/Minor Major1 Major2 Minor1 Minor2 <br />Conflicting Flow All 93 0 0 63 0 0 206 243 34 249 231 53 <br /> Stage 1 - - - - - - 136 136 - 67 67 - <br /> Stage 2 - - - - - - 70 107 - 183 165 - <br />Critical Hdwy 4.11 - - 4.33 - - 7.11 6.51 6.21 7.12 6.52 6.22 <br />Critical Hdwy Stg 1 - - - - - - 6.11 5.51 - 6.12 5.52 - <br />Critical Hdwy Stg 2 - - - - - - 6.11 5.51 - 6.12 5.52 - <br />Follow-up Hdwy 2.209 - - 2.407 - - 3.509 4.009 3.309 3.518 4.018 3.318 <br />Pot Cap-1 Maneuver 1507 - - 1417 - - 754 660 1042 704 669 1014 <br /> Stage 1 - - - - - - 869 786 - 944 839 - <br /> Stage 2 - - - - - - 943 809 - 819 762 - <br />Platoon blocked, %- -- - <br />Mov Cap-1 Maneuver 1507 - - 1417 - - 601 634 1042 519 642 1014 <br />Mov Cap-2 Maneuver - - - - - - 601 634 - 519 642 - <br /> Stage 1 - - - - - - 839 758 - 939 835 - <br /> Stage 2 - - - - - - 803 805 - 631 735 - <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 3.36 0.5 12.37 10.96 <br />HCM LOS B B <br />Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 <br />Capacity (veh/h)643 685 - - 102 - - 736 <br />HCM Lane V/C Ratio 0.241 0.034 - - 0.005 - - 0.18 <br />HCM Control Delay (s/veh) 12.4 7.5 0 - 7.6 0 - 11 <br />HCM Lane LOS B A A - A A - B <br />HCM 95th %tile Q(veh) 0.9 0.1 - - 0 - - 0.7
The URL can be used to link to this page
Your browser does not support the video tag.