Laserfiche WebLink
HCM 7th TWSC <br />3: I-90 WB Off Ramp/I-90 WB On Ramp & Yellowstone Trail Rd 06/09/2025 <br />PM Weekday Future - February 2045 3:29 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 3 <br />Intersection <br />Int Delay, s/veh 7.3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 200 10 0 0 10 5 100 5 5 0 0 0 <br />Future Vol, veh/h 200 10 0 0 10 5 100 5 5 0 0 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length - - - - - - - - - - - - <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 87 87 87 75 75 75 85 85 85 91 91 91 <br />Heavy Vehicles, % 0 0 0 0 0 0 7 7 7 0 0 0 <br />Mvmt Flow 230 11 0 0 13 7 118 6 6 0 0 0 <br />Major/Minor Major1 Major2 Minor1 <br />Conflicting Flow All 20 0 - - - 0 485 491 11 <br /> Stage 1 - - - - - - 471 471 - <br /> Stage 2 - - - - - - 13 20 - <br />Critical Hdwy 4.1 - - - - - 6.47 6.57 6.27 <br />Critical Hdwy Stg 1 - - - - - - 5.47 5.57 - <br />Critical Hdwy Stg 2 - - - - - - 5.47 5.57 - <br />Follow-up Hdwy 2.2 - - - - - 3.563 4.063 3.363 <br />Pot Cap-1 Maneuver 1609 - 0 0 - - 532 471 1055 <br /> Stage 1 - - 0 0 - - 618 551 - <br /> Stage 2 - - 0 0 - - 997 869 - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 1609 - - - - - 456 0 1055 <br />Mov Cap-2 Maneuver - - - - - - 456 0 - <br /> Stage 1 - - - - - - 529 0 - <br /> Stage 2 - - - - - - 997 0 - <br />Approach EB WB NB <br />HCM Control Delay, s/v 7.25 0 8.45 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR <br />Capacity (veh/h)1055 1599 - - - <br />HCM Lane V/C Ratio 0.011 0.143 - - - <br />HCM Control Delay (s/veh) 8.5 7.6 0 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 0.5 - - -