My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />5: Hyak Dr E & SR 906 & Driveway 06/09/2025 <br />PM Weekday Existing - February 2025 8:26 am 03/07/2025 Baseline Synchro 12 Report <br />Page 5 <br />Intersection <br />Int Delay, s/veh 7.6 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 35 1 38 0 9 48 50 101 2 13 58 33 <br />Future Vol, veh/h 35 1 38 0 9 48 50 101 2 13 58 33 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br />RT Channelized - - None - - None - - None - - None <br />Storage Length - - - - - - - - - - - - <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 88 88 88 75 75 75 87 87 87 87 87 87 <br />Heavy Vehicles, % 1 1 1 23 23 23 1 1 1 2 2 2 <br />Mvmt Flow 40 1 43 0 12 64 57 116 2 15 67 38 <br />Major/Minor Major1 Major2 Minor1 Minor2 <br />Conflicting Flow All 76 0 0 44 0 0 148 178 23 183 168 44 <br /> Stage 1 - - - - - - 102 102 - 44 44 - <br /> Stage 2 - - - - - - 45 76 - 139 124 - <br />Critical Hdwy 4.11 - - 4.33 - - 7.11 6.51 6.21 7.12 6.52 6.22 <br />Critical Hdwy Stg 1 - - - - - - 6.11 5.51 - 6.12 5.52 - <br />Critical Hdwy Stg 2 - - - - - - 6.11 5.51 - 6.12 5.52 - <br />Follow-up Hdwy 2.209 - - 2.407 - - 3.509 4.009 3.309 3.518 4.018 3.318 <br />Pot Cap-1 Maneuver 1529 - - 1439 - - 823 717 1057 778 725 1026 <br /> Stage 1 - - - - - - 906 812 - 970 858 - <br /> Stage 2 - - - - - - 971 834 - 864 793 - <br />Platoon blocked, %- -- - <br />Mov Cap-1 Maneuver 1529 - - 1439 - - 700 698 1057 633 706 1026 <br />Mov Cap-2 Maneuver - - - - - - 700 698 - 633 706 - <br /> Stage 1 - - - - - - 882 791 - 970 858 - <br /> Stage 2 - - - - - - 863 834 - 716 772 - <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 3.51 0 11.16 10.21 <br />HCM LOS B B <br />Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 <br />Capacity (veh/h)703 713 - - 1439 - - 796 <br />HCM Lane V/C Ratio 0.168 0.026 - - - - - 0.131 <br />HCM Control Delay (s/veh) 11.2 7.4 0 - 0 - - 10.2 <br />HCM Lane LOS B A A - A - - B <br />HCM 95th %tile Q(veh) 0.6 0.1 - - 0 - - 0.5
The URL can be used to link to this page
Your browser does not support the video tag.