My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 01/31/2025 <br />PM Weekend Future - October 2044 3:50 pm 01/07/2025 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 3.1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 30 0 25 0 0 0 0 70 20 5 45 0 <br />Future Vol, veh/h 30 0 25 0 0 0 0 70 20 5 45 0 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 85 85 85 91 91 91 75 75 75 <br />Heavy Vehicles, % 000000333101010 <br />Mvmt Flow 40 0 33 0 0 0 0 77 22 7 60 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 150 172 60 - 0 0 99 0 0 <br /> Stage 1 73 73 ------- <br /> Stage 2 77 99 ------- <br />Critical Hdwy 6.4 6.5 6.2 - - - 4.2 - - <br />Critical Hdwy Stg 15.45.5------- <br />Critical Hdwy Stg 25.45.5------- <br />Follow-up Hdwy 3.5 4 3.3 - - - 2.29 - - <br />Pot Cap-1 Maneuver 846 725 1011 0 - - 1445 - 0 <br /> Stage 1 955 838 -0 ----0 <br /> Stage 2 951 817 -0 ----0 <br />Platoon blocked, %- -- <br />Mov Cap-1 Maneuver 842 0 1011 - - - 1445 - - <br />Mov Cap-2 Maneuver 842 0 ------- <br /> Stage 1 955 0 ------- <br /> Stage 2 947 0 ------- <br />Approach EB NB SB <br />HCM Control Delay, s/v 9.29 0 0.75 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBREBLn1 SBL SBT <br />Capacity (veh/h)- - 911 180 - <br />HCM Lane V/C Ratio - - 0.08 0.005 - <br />HCM Control Delay (s/veh) - - 9.3 7.5 0 <br />HCM Lane LOS - - A A A <br />HCM 95th %tile Q(veh) - - 0.3 0 -
The URL can be used to link to this page
Your browser does not support the video tag.