Laserfiche WebLink
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 01/31/2025 <br />PM Weekday Future - October 2044 3:04 pm 01/08/2025 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 3.3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 5 5 20 0 0 0 0 10 40 10 10 0 <br />Future Vol, veh/h 5 5 20 0 0 0 0 10 40 10 10 0 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 86 86 86 75 75 75 75 75 75 <br />Heavy Vehicles, % 000000888333333 <br />Mvmt Flow 7 7 27 0 0 0 0 13 53 13 13 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 53 107 13 - 0 0 67 0 0 <br /> Stage 1 40 40 ------- <br /> Stage 2 13 67 ------- <br />Critical Hdwy 6.4 6.5 6.2 - - - 4.43 - - <br />Critical Hdwy Stg 15.45.5------- <br />Critical Hdwy Stg 25.45.5------- <br />Follow-up Hdwy 3.5 4 3.3 - - - 2.497 - - <br />Pot Cap-1 Maneuver 960 787 1073 0 - - 1359 - 0 <br /> Stage 1 988 866 -0 ----0 <br /> Stage 2 1015 843 -0 ----0 <br />Platoon blocked, %- -- <br />Mov Cap-1 Maneuver 951 0 1073 - - - 1359 - - <br />Mov Cap-2 Maneuver 951 0 ------- <br /> Stage 1 988 0 ------- <br /> Stage 2 1005 0 ------- <br />Approach EB NB SB <br />HCM Control Delay, s/v 8.58 0 3.84 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBREBLn1 SBL SBT <br />Capacity (veh/h)- - 1046 900 - <br />HCM Lane V/C Ratio - - 0.038 0.01 - <br />HCM Control Delay (s/veh) - - 8.6 7.7 0 <br />HCM Lane LOS - - A A A <br />HCM 95th %tile Q(veh) - - 0.1 0 -