Laserfiche WebLink
<br /> <br /> Appendix G | 4 <br />Table 2: Existing Peak Hour LOS Results <br /> October 2024 <br />Weekday <br />October 2024 <br />Weekend <br />February 2025 <br />Weekday <br />February 2025 <br />Weekend <br />Intersection Name LOS Delay (S) LOS Delay (S) LOS Delay (S) LOS Delay (S) <br />SR 906 & I-90 EB Off Ramp A 9.4 A 9.6 B 11 C 15.2 <br />SR 906 & Guye Peak Lane/Driveway A 9.8 B 10.6 B 12.3 B 12 <br />I-90 WB Off Ramp/I-90 WB On Ramp & <br />Yellowstone Trail Rd <br />A 8.4 A 8.4 A 8.4 A 8.4 <br />SR 906 & Tanner Way/Driveway A 9.5 A 9.1 B 10.1 B 11.7 <br />Hyak Dr E & SR 906 & Driveway A 9.5 A 9.8 B 11.2 B 14.3 <br />SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp A 8.5 A 9.1 A 9.1 B 10.5 <br />SR 906 & I-90 WB Ramp A 8.8 A 8.9 A 8.7 A 9.3 <br />Fehr & Peers, 2025. <br />Notes: Delay is measured in seconds. <br /> <br /> <br /> <br /> <br /> <br />