Laserfiche WebLink
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 06/09/2025 <br />PM Weekend Future - February 2045 3:33 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 4.2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 60 5 190 0 0 0 0 375 50 10 60 0 <br />Future Vol, veh/h 60 5 190 0 0 0 0 375 50 10 60 0 <br />Conflicting Peds, #/hr 4 0 4 2 0 2 4 0 2 2 0 4 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized --None --None --None --None <br />Storage Length ------------ <br />Veh in Median Storage, #-0 --0 --0 --0 - <br />Grade, %-0 --0 --0 --0 - <br />Peak Hour Factor 88 88 88 87 87 87 92 92 92 88 88 88 <br />Heavy Vehicles, %0 0 0 0 0 0 2 2 2 2 2 2 <br />Mvmt Flow 68 6 216 0 0 0 0 408 54 11 68 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 503 555 72 -0 0 464 0 0 <br /> Stage 1 91 91 ------- <br /> Stage 2 412 464 ------- <br />Critical Hdwy 6.4 6.5 6.2 ---4.12 -- <br />Critical Hdwy Stg 1 5.4 5.5 ------- <br />Critical Hdwy Stg 2 5.4 5.5 ------- <br />Follow-up Hdwy 3.5 4 3.3 ---2.218 -- <br />Pot Cap-1 Maneuver 532 443 996 0 --1097 -0 <br /> Stage 1 938 824 -0 ----0 <br /> Stage 2 673 567 -0 ----0 <br />Platoon blocked, %--- <br />Mov Cap-1 Maneuver 526 0 992 ---1097 -- <br />Mov Cap-2 Maneuver 526 0 ------- <br /> Stage 1 938 0 ------- <br /> Stage 2 666 0 ------- <br />Approach EB NB SB <br />HCM Control Delay, s/v11.79 0 1.19 <br />HCM LOS B <br />Minor Lane/Major Mvmt NBT NBR EBLn1 SBL SBT <br />Capacity (veh/h)--818 257 - <br />HCM Lane V/C Ratio --0.354 0.01 - <br />HCM Control Delay (s/veh)--11.8 8.3 0 <br />HCM Lane LOS --B A A <br />HCM 95th %tile Q(veh)--1.6 0 -