Laserfiche WebLink
HCM 7th TWSC <br />1: SR 906 & I-90 EB Off Ramp 06/09/2025 <br />PM Weekend Future - February 2045 3:33 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 2.8 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 105 350 0 545 110 0 <br />Future Vol, veh/h 105 350 0 545 110 0 <br />Conflicting Peds, #/hr 25 25 33 0 0 25 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized -Free -None -None <br />Storage Length 0 0 ---- <br />Veh in Median Storage, #0 --0 0 - <br />Grade, %0 --0 0 - <br />Peak Hour Factor 86 86 85 85 84 84 <br />Heavy Vehicles, %0 0 1 1 5 5 <br />Mvmt Flow 122 407 0 641 131 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 797 --0 -0 <br /> Stage 1 131 ----- <br /> Stage 2 666 ----- <br />Critical Hdwy 6.4 ----- <br />Critical Hdwy Stg 1 5.4 ----- <br />Critical Hdwy Stg 2 5.4 ----- <br />Follow-up Hdwy 3.5 ----- <br />Pot Cap-1 Maneuver 358 0 0 --0 <br /> Stage 1 900 0 0 --0 <br /> Stage 2 514 0 0 --0 <br />Platoon blocked, %-- <br />Mov Cap-1 Maneuver 358 ----- <br />Mov Cap-2 Maneuver 358 ----- <br /> Stage 1 900 ----- <br /> Stage 2 514 ----- <br />Approach EB NB SB <br />HCM Control Delay, s/v20.15 0 0 <br />HCM LOS C <br />Minor Lane/Major Mvmt NBT EBLn1 EBLn2 SBT <br />Capacity (veh/h)-358 -- <br />HCM Lane V/C Ratio -0.341 -- <br />HCM Control Delay (s/veh)-20.2 0 - <br />HCM Lane LOS -C A - <br />HCM 95th %tile Q(veh)-1.5 --