My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-public-works-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:26:50 PM
Creation date
4/30/2026 12:15:15 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144005
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />5: Hyak Dr E & SR 906 & Driveway 06/09/2025 <br />PM Weekend Existing - February 2025 10:28 am 03/07/2025 Baseline Synchro 12 Report <br />Page 5 <br />Intersection <br />Int Delay, s/veh 9.5 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 52 12 47 7 13 81 44 161 17 73 77 54 <br />Future Vol, veh/h 52 12 47 7 13 81 44 161 17 73 77 54 <br />Conflicting Peds, #/hr 4 0 4 2 0 2 4 0 2 2 0 4 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br />RT Channelized --None --None --None --None <br />Storage Length ------------ <br />Veh in Median Storage, #-0 --0 --0 --0 - <br />Grade, %-0 --0 --0 --0 - <br />Peak Hour Factor 84 84 84 90 90 90 80 80 80 86 86 86 <br />Heavy Vehicles, %5 5 5 6 6 6 1 1 1 0 0 0 <br />Mvmt Flow 62 14 56 8 14 90 55 201 21 85 90 63 <br />Major/Minor Major1 Major2 Minor1 Minor2 <br />Conflicting Flow All 108 0 0 74 0 0 249 294 48 320 277 67 <br /> Stage 1 ------170 170 -79 79 - <br /> Stage 2 ------79 124 -241 198 - <br />Critical Hdwy 4.15 --4.16 --7.11 6.51 6.21 7.1 6.5 6.2 <br />Critical Hdwy Stg 1 ------6.11 5.51 -6.1 5.5 - <br />Critical Hdwy Stg 2 ------6.11 5.51 -6.1 5.5 - <br />Follow-up Hdwy 2.245 --2.254 --3.509 4.009 3.309 3.5 4 3.3 <br />Pot Cap-1 Maneuver 1464 --1500 --707 619 1023 637 634 1002 <br /> Stage 1 ------834 760 -935 833 - <br /> Stage 2 ------932 795 -767 741 - <br />Platoon blocked, %---- <br />Mov Cap-1 Maneuver 1459 --1495 --536 584 1018 393 598 995 <br />Mov Cap-2 Maneuver ------536 584 -393 598 - <br /> Stage 1 ------794 724 -926 826 - <br /> Stage 2 ------772 788 -517 706 - <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 3.55 0.51 14.28 11.38 <br />HCM LOS B B <br />Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 <br />Capacity (veh/h)609 727 --106 --716 <br />HCM Lane V/C Ratio 0.365 0.042 --0.005 --0.213 <br />HCM Control Delay (s/veh)14.3 7.6 0 -7.4 0 -11.4 <br />HCM Lane LOS B A A -A A -B <br />HCM 95th %tile Q(veh)1.7 0.1 --0 --0.8
The URL can be used to link to this page
Your browser does not support the video tag.