Laserfiche WebLink
HCM 7th TWSC <br />1: SR 906 & I-90 EB Off Ramp 06/09/2025 <br />PM Weekend Existing - February 2025 10:28 am 03/07/2025 Baseline Synchro 12 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 2 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 81 275 0 429 87 0 <br />Future Vol, veh/h 81 275 0 429 87 0 <br />Conflicting Peds, #/hr 25 25 33 0 0 25 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized -Free -None -None <br />Storage Length 0 0 ---- <br />Veh in Median Storage, #0 --0 0 - <br />Grade, %0 --0 0 - <br />Peak Hour Factor 86 86 85 85 84 84 <br />Heavy Vehicles, %0 0 1 1 5 5 <br />Mvmt Flow 94 320 0 505 104 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 633 --0 -0 <br /> Stage 1 104 ----- <br /> Stage 2 530 ----- <br />Critical Hdwy 6.4 ----- <br />Critical Hdwy Stg 1 5.4 ----- <br />Critical Hdwy Stg 2 5.4 ----- <br />Follow-up Hdwy 3.5 ----- <br />Pot Cap-1 Maneuver 447 0 0 --0 <br /> Stage 1 926 0 0 --0 <br /> Stage 2 595 0 0 --0 <br />Platoon blocked, %-- <br />Mov Cap-1 Maneuver 447 ----- <br />Mov Cap-2 Maneuver 447 ----- <br /> Stage 1 926 ----- <br /> Stage 2 595 ----- <br />Approach EB NB SB <br />HCM Control Delay, s/v 15.2 0 0 <br />HCM LOS C <br />Minor Lane/Major Mvmt NBT EBLn1 EBLn2 SBT <br />Capacity (veh/h)-447 -- <br />HCM Lane V/C Ratio -0.211 -- <br />HCM Control Delay (s/veh)-15.2 0 - <br />HCM Lane LOS -C A - <br />HCM 95th %tile Q(veh)-0.8 --