My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-public-works-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:26:50 PM
Creation date
4/30/2026 12:15:15 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144005
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />4: SR 906 & Tanner Way/Driveway 06/09/2025 <br />PM Weekday Future - February 2045 3:29 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 4 <br />Intersection <br />Int Delay, s/veh 3.9 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 40 5 30 5 5 10 20 95 5 5 70 45 <br />Future Vol, veh/h 40 5 30 5 5 10 20 95 5 5 70 45 <br />Conflicting Peds, #/hr 8 0 3 2 0 7 3 0 2 7 0 8 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized --None --None --None --None <br />Storage Length ------------ <br />Veh in Median Storage, #-0 --0 --0 --0 - <br />Grade, %-0 --0 --0 --0 - <br />Peak Hour Factor 75 75 75 75 75 75 79 79 79 94 94 94 <br />Heavy Vehicles, %0 0 0 0 0 0 4 4 4 0 0 0 <br />Mvmt Flow 53 7 40 7 7 13 25 120 6 5 74 48 <br />Major/Minor Minor2 Minor1 Major1 Major2 <br />Conflicting Flow All 299 301 109 272 322 138 130 0 0 134 0 0 <br /> Stage 1 117 117 -181 181 ------- <br /> Stage 2 182 184 -91 141 ------- <br />Critical Hdwy 7.1 6.5 6.2 7.1 6.5 6.2 4.14 --4.1 -- <br />Critical Hdwy Stg 1 6.1 5.5 -6.1 5.5 ------- <br />Critical Hdwy Stg 2 6.1 5.5 -6.1 5.5 ------- <br />Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.236 --2.2 -- <br />Pot Cap-1 Maneuver 657 615 950 684 599 915 1443 --1464 -- <br /> Stage 1 892 803 -825 753 ------- <br /> Stage 2 824 751 -921 784 ------- <br />Platoon blocked, %---- <br />Mov Cap-1 Maneuver 617 593 941 628 578 904 1433 --1455 -- <br />Mov Cap-2 Maneuver 617 593 -628 578 ------- <br /> Stage 1 883 794 -805 735 ------- <br /> Stage 2 784 733 -869 776 ------- <br />Approach EB WB NB SB <br />HCM Control Delay, s/v10.87 10.17 1.26 0.31 <br />HCM LOS B B <br />Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR <br />Capacity (veh/h)297 --713 722 70 -- <br />HCM Lane V/C Ratio 0.018 --0.14 0.037 0.004 -- <br />HCM Control Delay (s/veh)7.6 0 -10.9 10.2 7.5 0 - <br />HCM Lane LOS A A -B B A A - <br />HCM 95th %tile Q(veh)0.1 --0.5 0.1 0 --
The URL can be used to link to this page
Your browser does not support the video tag.