Laserfiche WebLink
HCM 7th TWSC <br />1: SR 906 & I-90 EB Off Ramp 06/09/2025 <br />PM Weekday Future - February 2045 3:29 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 2.7 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 100 295 0 230 85 0 <br />Future Vol, veh/h 100 295 0 230 85 0 <br />Conflicting Peds, #/hr 0 8 8 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized -Free -None -None <br />Storage Length 0 0 ---- <br />Veh in Median Storage, #0 --0 0 - <br />Grade, %0 --0 0 - <br />Peak Hour Factor 91 91 76 76 93 93 <br />Heavy Vehicles, %1 1 2 2 0 0 <br />Mvmt Flow 110 324 0 303 91 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 394 --0 -0 <br /> Stage 1 91 ----- <br /> Stage 2 303 ----- <br />Critical Hdwy 6.41 ----- <br />Critical Hdwy Stg 1 5.41 ----- <br />Critical Hdwy Stg 2 5.41 ----- <br />Follow-up Hdwy 3.509 ----- <br />Pot Cap-1 Maneuver 613 0 0 --0 <br /> Stage 1 935 0 0 --0 <br /> Stage 2 752 0 0 --0 <br />Platoon blocked, %-- <br />Mov Cap-1 Maneuver 613 ----- <br />Mov Cap-2 Maneuver 613 ----- <br /> Stage 1 935 ----- <br /> Stage 2 752 ----- <br />Approach EB NB SB <br />HCM Control Delay, s/v12.16 0 0 <br />HCM LOS B <br />Minor Lane/Major Mvmt NBT EBLn1 EBLn2 SBT <br />Capacity (veh/h)-613 -- <br />HCM Lane V/C Ratio -0.179 -- <br />HCM Control Delay (s/veh)-12.2 0 - <br />HCM Lane LOS -B A - <br />HCM 95th %tile Q(veh)-0.6 --