Laserfiche WebLink
BELSAAS & SMITH GONSTRUCTION <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />SHEET 2 of 2 c.o.P.#2.1 <br />ooo <br />9,.@a <br />m <br />o6'!o <br />F <br />@{5oN0{@@?oqa <br />P6Noo <br />@ <br />ooNmo@@ <br />oE <br />$ 23.459.90 <br />$ 132J157.43 <br />$ 346.70 <br />$ <br />$ <br />$ 155.617.32 <br />$ 612.00 <br />s 2.101.20 <br />$ 23,459.90 <br />$ 23,459.90 <br />$ 15s,617.32 <br />LABOR <br />COST <br />$ 20,400.00$ 114,920.00 <br />$ 3,447.60 <br />$ 11.836.76 <br />$ 1.953.07 <br />MATERIAL <br />COST <br />$ 132.157.43 <br />$ 132j57.43 <br />$ <br />$ <br />SUB TOTAL <br />TOTAL <br />SUB <br />COST <br />$ <br />$ <br />$ <br />$ <br />$ <br />EQUIP <br />COST <br />$ <br />GMND TOTAL <br />TOTALS FROM PREVIOUS PAGE <br />OVERHEAD 3% <br />PROFIT 1O% <br />BONDING 1.5% <br />SUB TOTAL <br />SUB TOTAL <br />LABOR <br />MATERIAL <br />EQUIPMENT <br />SUBCONTRACTORS <br />SUB TOTAL <br />TIME EXTENTION REQUIRED; <br />NOTICE TO PROCEED REQUIRED BY <br />121 Days or until August 28, 2026 <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.